My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008329
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRETHEWAY
>
21167
>
2900 - Site Mitigation Program
>
PR0545760
>
ARCHIVED REPORTS_XR0008329
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 10:26:55 AM
Creation date
6/15/2020 10:13:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008329
RECORD_ID
PR0545760
PE
2952
FACILITY_ID
FA0023669
FACILITY_NAME
MILDRED DE VINCENZI
STREET_NUMBER
21167
Direction
N
STREET_NAME
TRETHEWAY
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01726038
CURRENT_STATUS
02
SITE_LOCATION
21167 N TRETHEWAY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,e <br /> • <br /> Health and Safety Plan <br /> Underground Tank Investigation <br /> INTRODUCTION <br /> PURPOSE AND SCOPE <br /> The Health and Safety Plan, for contaminated soil re-excavation resample <br /> provides for the protection of on-site personnel and the surrounding <br /> community during site characterization activities. The requirements, <br /> specifications and procedures presented with this plan will apply to all <br /> personnel on-site, including employees, sub-contractors, site visitors and <br /> regulatory agency personnel. <br /> • KEY PERSONNEL <br /> • <br /> HAZARD ANALYSIS <br /> The most significant risk associated with petroleum contaminated soil is <br /> exposure to aromatic compounds. Skin contact will be eliminated by use of <br /> clothing, eye wear, and gloves and the inhalation hazard will be minimized <br /> using appropriate respiratory protective devices as determined by on-site <br /> air monitoring. The Safety Coordinator/Project Manager will establish an <br /> exclusion zone encompassing a 50 foot radius from the work area. Access <br /> within this zone will be limited to required personnel. Total organic <br /> vapors Will be monitored within the exclusion zone using a photoaonazation <br /> detector (PID) calibrated for benzene the most toxic of the aromatic <br /> hydrocarbons. Current enforceable and recommended exposure limitations <br /> for potential site contaminants are presented an Table 1 . <br /> X <br />
The URL can be used to link to this page
Your browser does not support the video tag.