My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2900 - Site Mitigation Program
>
PR0545765
>
FIELD DOCUMENTS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 11:16:33 AM
Creation date
6/15/2020 11:08:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
CASE 1
RECORD_ID
PR0545765
PE
3528
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ENVIRONMENTAL SCIENCE& ENGINEERING, INC, <br /> CONCORD,CALIFORNIA,OFFICE <br /> STANDARD OPERATING PROCEDURE NO.2 <br /> FOR MONITORING WELL INSTALLk7ION AND DEVELOPMENT 1 <br /> PAGE 2 <br /> F <br /> `technician will monitor the ground water 'purged from the well during development for { <br /> and condo city,temperature,pH <br /> ctivYty. Development of the well will proceed until the well produces relatively clear,sand-free water <br /> with stable tennperat u�e,pH and conductivity measurements. At a minimum, 10 well-rasing volumes of ground <br /> water will be removed during the development process. Measurements of temperature,conductivity,pH and <br /> volume of the purged water and observations of purge water clarity and sediment content will be recorded on <br /> the ESE Wen Development Data Forms,i All equipment used during the well development prooedure will be <br /> cleaned using an Alconox+detergent and";tap water solution followed by a tap water rinse prior to use in each <br /> well. All ground water purged during the well development proem and all equipment rinse water will be <br /> collected and contained onsite in DOT approved containers{(ypicallyS5-gallon drums)pending analytical results <br /> and proper disposal or recycling. <br /> i <br /> 4 <br /> r <br /> l <br /> E\yrs\�1� <br />
The URL can be used to link to this page
Your browser does not support the video tag.