�'q�KEEIIVFELDER S <br /> 4 IMPIJaMENTATION AND FINAL REPORT <br /> r <br /> In an effort to expedite the removal and disposition of the soil from the <br /> AT&T site, Kleinfelder and SEM intend to implement the work plan within <br /> two weeks of receiving authorization from AT&T. If Forward Landfill, is <br /> unable to immediately aerate the soil due to current aeration projects, <br /> the soil will be stored and covered at the landfill until aeration may <br /> begin. Analytical results for the confirmation aeration samples will be <br /> received within two to three weeks -of submittal. A final soil remediation <br /> report summarizing the results of the soil aeration and disposal will be <br /> prepared and submitted to the regulatory agencies. <br /> Table 1 is a timeline for the proposed hauling, aeration, disposition, and <br /> report for the excavated soil. <br /> 1 <br /> FI <br /> 1� <br /> �I <br /> `I <br /> II <br /> fEl ' <br /> 59-87-679 6 <br />