My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012716
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2900 - Site Mitigation Program
>
PR0545765
>
ARCHIVED REPORTS_XR0012716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 11:24:21 AM
Creation date
6/15/2020 11:11:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012716
RECORD_ID
PR0545765
PE
3528
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Updating equipment or procedures based upon new <br /> z, he site inspection; <br /> information gathered during the levels of personal <br /> 3, upgrading or downgrading <br /> protection based upon site observations; <br /> 4. Determining and posting locations and routes to medical <br /> facilities (including poison control centers) and <br /> arranging emergency transportation to medical facilities <br /> (as required) ; emergency officers <br /> 5. Notifying (as required) local publicthe nature of the <br /> (i.e. , police and fire departments) telephone numbers <br /> team's operatiof ons and making emergency p <br /> available to all team members; <br /> 6. Ensuring that at least one member of the field team is <br /> available to stay behind and notify emergency services <br /> if the site Safety officer must enter an area of maximum <br /> hazard or entering this area only after notifying <br /> emergency services (police department) ; <br /> oms of on site <br /> 7, observing work party members for symp <br /> exposure or stress; and of on site emergency <br /> g, Arranging for the availability <br /> medical care and first aid, as necessary. <br /> and <br /> The Site Safety officer operation that threatens the responsibility <br /> alth�ortsafety <br /> authority to stop any , or that may cause significant <br /> of the team or surrounding populace <br /> adverse, impact to the environment. <br /> The responsibilities of the Field Team Deader include: <br /> 1. Ensuring and enforcing compliance with the <br /> Project Safety Plan; of unauthorized personnel or <br /> z. Controlling site entry <br /> coordinating with local law enforcement agencies or <br /> state authorities to limit site access; <br /> 3. Coordinating site activities such that they may be <br /> performed in an efficient and safe manner consistent <br /> with the Project Safety and <br /> 4. Enforcing the buddy system on site; <br /> - 5, Ensuring the ready access and availability of all safety <br /> equipment. <br /> The responsibilities of all other on site personnel include: <br /> 1. Complying with all aspects of the Project Safety Plan, <br /> including <br /> ofict erence to the Fieldthe Teamuddy system; <br /> Le der and the site <br /> 2, Obeying <br /> Safety Officer; and officer <br /> 3. Notifying the Field Team Leader or Site Safety <br /> of hazardous or potentially hazardous incidents or <br /> working situations. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.