My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
2300 - Underground Storage Tank Program
>
PR0231631
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
6/15/2020 11:14:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231631
PE
2361
FACILITY_ID
FA0000091
FACILITY_NAME
H&S Energy Products,#3038
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 4mciden# <br /> Dates and times are displayed in the (UTC-08 : 00) Pacific Time (US & Canada) time zone. <br /> Customer Details <br /> Name : Beverly Schmidt Customer ID . <br /> Location : 14000 E Highway 88, Lockeford, Ca 95237 Department: <br /> Company : CE 40138 Phone : 209-727-5442 <br /> Email : sac38@sacstations. com <br /> Details <br /> Status : Closed <br /> Priority : High <br /> Assignee: David Baskerville . <br /> Followup : 12/18/2019 <br /> Short Description <br /> Description <br /> power outage 1245- 19 at approximately 6 : 30 pm to the veeder root,dispensers,turbines, all exterior lighting and Internet. went out <br /> Resolution <br /> on call technician David Baskerville performed trouble shooting and identified power surge to main breaker which tripped and caused all to go out (As <br /> mentioned above in description) . <br /> After restoring power the veeder root did not come back up and was frozen . Tech then had to perform a cold start to reestablish communication on <br /> veeder root. All functions normal after cold start was complete and all dispensers back up . <br /> NOTE: Walton Engineering has been contacted and they will schedule a Cold Start Monitoring Certification Systems Test per permit requirements . <br /> R E E � # ED <br /> DEC 16 2019 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.