My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007380
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2900 - Site Mitigation Program
>
PR0545765
>
ARCHIVED REPORTS_XR0007380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 11:25:58 AM
Creation date
6/15/2020 11:15:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007380
RECORD_ID
PR0545765
PE
3528
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> SAKI JOAQUIN COUNTY AIR POLLUTION CONTROL DISTRICT <br /> TO APCD Staff <br /> rFROM: Seyed Sadredin , Assistant AP Engineer <br /> DATE- October 1 6, 1986 <br /> RE: Contaminated Soil <br /> Aeration <br /> The following policy is followed by the San Joaquin County Air Pollution Control <br /> District in approval of such projects - <br /> 1 . Uncontrolled Aeration <br /> A person shall not aerate contaminated soil at a rate in excess of that specifies <br /> in the following table for the degree of organic conteiz. The following <br /> limitations apply to the entire facility: <br /> Allowable Rate of Uncontrolled Aeration <br /> Organic Content Rate of Uncontrolled Aeration <br /> ppm (weight) Cubic meters/day Cubic yards/day <br /> ^ <br /> -450 Exempt <br /> 50-100 459.0 600 <br /> 100-500 91 .8 120 <br /> 500-1000 45.9 60 <br /> 1000--2000 22.9 30 <br /> 2000-3000 15.3 15 <br /> 3000-4000 11 .5 10 <br /> 4000-5000 9.2 8 <br /> 5000 0 08 0.1 <br /> 2. Controlled Aeration <br /> Soil may be aerated at rates exceeding the above limitations provided emissions <br /> of organic compounds to the atmosphere are reduced by at least 90'0 by weight <br /> 3 Storage Piles <br /> Contaminated soil which is not being aerated shall be covered except when soil is <br /> being added or removed. Any uncovered contaminated soil will be considered to be <br /> aerated. <br /> 4. Administrative Requirements <br /> The person responsible for aeration of any contaminated soil shall provide the <br /> District , by telephone, with the following information This shall be provided <br /> no less than 24 hours prior to aeration of any contaminated soil . The District <br /> shall be notified within 24 hours if any of the parameters change. <br /> a Location <br /> b. Quantity of soil to be aerated (total ) . <br /> c. Quantity of soil to be aerated in any day <br /> d. Average degree of contamination, or total organic content of soil • <br />
The URL can be used to link to this page
Your browser does not support the video tag.