Laserfiche WebLink
TABLE OF CONTENTS <br /> ' Page <br /> 10 INTRODUCTION 1 <br /> 11 Scope of Work 1 <br /> ' 20 SITE BACKGROUND 3 <br /> ' <br /> 30 PROCEDURES 5 <br /> 3 1 Soil Borings and Soil Sampling 5 <br /> 3.2 Well Installation, Development and Surveying 6 <br /> ' 3.3 Ground Water Monitoring and Sampling 7 <br /> 4.0 RESULTS 9 <br /> ' <br /> 41 Soil Borings and Soil Sampling 9 <br /> 4 2 Ground Water Flow 10 <br /> 4.3 Ground Water Samples 10 <br /> 50 CONCLUSIONS 11 <br /> 6.0 RECOMMENDATIONS 12 <br /> 7.0 REFERENCES 13 <br />' FIGURES <br />' Figure 1 - Site Location Map <br /> Figure 2 - Site Map <br /> Figure 3 - Ground Water Elevations, May 28, 1993 <br />' TABLES <br /> Table 1 - Ground Water Elevation <br /> Table 2 - Analytical Results of Ground Water Samples <br /> APPENDICES <br /> t Appendix A - Boring Logs and Well Construction Data <br /> Appendix B - ESE Standard Operating Procedures <br /> Appendix C - Ground Water Sampling Data Forms <br /> Appendix D - Laboratory Analytical Results and Chain of Custody Documentation <br /> Soil Samples <br /> Appendix E - Laboratory Analytical Results and Chain of Custody Documentation <br /> Ground Water Samples <br />