Laserfiche WebLink
In telephone conversations and a letter to the PHS/EHD dated December 18, 1992, ESE <br /> proposed to install two soil bonngs in the area of soil boring B-2Y rather than installing an <br /> tadditional ground water monitoring well at the site However, as stated in their letter dated <br /> March 2, 1993, the PHS/EHD required that in addition to drilling soil bonngs in the vicuuty <br /> ' of B-2Y, one additional monitoring well should be installed downgradient of B-2Y Based <br /> on discussions with Mr Harlin Knoll of the PHS/EHD, the additional well was to be <br />' located west and downgradient of the former tank excavation. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> F, \5425009\ADDSASSF-RPT 4 <br />