Laserfiche WebLink
i <br /> I <br /> Mr. Ron Rowe <br /> Page 3 f <br /> A summary report will be prepared for submittal to PHS/EHD after field work and Iaboratory <br /> analyses are completed. The report will include a description of the field work, the methods <br /> used, results, site map, tables, conclusions, and recommendations: I <br /> If you have any questions or comments regarding this workplan; please contact Ground Zero at <br /> your convenience. <br /> Sincerely, <br /> Ground Zero Analysis, Inc. <br /> I <br /> Jeanne Buckthal \� E.D Ge <br /> Staff Geologist �, <br /> GREGORY P. <br /> STAHL <br /> No. 5023 <br /> Gregory P. Stahl, RG 5023 <br /> LP <br /> CA Certified Hydrogeologist 264 <br /> F OF CAO' <br /> Attachments <br /> pc Mr. Tom Watson, Western Building Materials <br /> Mr. Chester Raypholtz, Fresno Roofing Company, Inc. <br /> Regional Water Quality Control Board, Sacramento <br /> I <br /> i <br /> I <br /> wbw%woftt= <br /> L <br /> . F <br />