My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAN BUREN
>
733
>
3500 - Local Oversight Program
>
PR0545787
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 11:46:22 AM
Creation date
6/15/2020 11:19:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545787
PE
3528
FACILITY_ID
FA0009091
FACILITY_NAME
MASONITE CORPORATION
STREET_NUMBER
733
Direction
S
STREET_NAME
VAN BUREN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14711010
CURRENT_STATUS
02
SITE_LOCATION
733 S VAN BUREN ST
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�+ %ONO' <br /> external performance audits conducted by EPA and DHS using QC labs. The specific analytical <br /> methods to be utilized for purgeable and semivolatile hydrocarbons analyses are shown on Table <br /> 2. <br /> 9.0 GROUNDWATER MONITORING PROTOCOL <br /> Monitoring of depth to water and free phase LNAPL (light non-aqueous phase liquids) thickness <br /> within wells will be conducted using an interface probe or conductivity meter. For consistency, <br /> all measurements will be taken from the north side of the wellhead at the survey mark. To <br /> assess potential infiltration of fine grained sediments, total well depth will also be sounded. <br /> Thickness of LNAPL on the groundwater surface is calculated by subtracting the depth to <br /> product from the depth to water. In addition, water elevations are adjusted for the presence of <br /> fuel with the following calculation: <br /> (LNAPL Thickness)(specific gravity) + (Water Elevation)= Corrected Water Elevation <br /> Newly installed wells will be allowed to stabilize for 24 hours after development prior to free <br /> phase thickness determination. <br /> An acrylic Surface Sampler will be used for visual inspection of the groundwater in order to note <br /> sheens (difficult to detect with the Interface Probe), odors, microbial action and sediments. The <br /> sampler is calibrated in inches and centimeters for visual inspection of product thickness. <br /> To reduce the potential for cross contamination between wells, the monitorings will take place <br /> in order from the least to most contaminated, if known. Well containing free product will be <br /> monitored last. Between each well monitoring the equipment will be decontaminated. <br /> Water level data collected from the wells will be used to develop a groundwater contour map <br /> for the project site. Groundwater flow will be estimated to be perpendicular to equipotential <br /> lines drawn on the map. <br /> 10.0 WELL DEVELOPMENT PROTOCOL <br /> Groundwater monitoring wells will be surged and developed prior to sampling activities. <br /> Approximately 10 times the volume of water in the casing will be withdrawn if possible. <br /> If the aquifer is slow to recharge, development will continue until recharge is too slow to <br /> practically continue. The volume of water produced versus time will be recorded. All <br /> withdrawn groundwater will be stored on-site in 55 gallon waste drums unless permission is <br /> granted by the appropriate regulatory agency to discharge the water to the ground surface or <br /> sanitary sewer. Drummed water will be labeled with the source of the water to help ensure <br /> appropriate disposal based on contamination levels. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.