My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VENTURA
>
100
>
3500 - Local Oversight Program
>
PR0545790
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 12:28:42 PM
Creation date
6/15/2020 12:21:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545790
PE
3528
FACILITY_ID
FA0011052
FACILITY_NAME
West Wind
STREET_NUMBER
100
Direction
S
STREET_NAME
VENTURA
STREET_TYPE
AVE
City
STOCKTON
Zip
95203-2920
APN
14505017
CURRENT_STATUS
02
SITE_LOCATION
100 S VENTURA AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- _ Di.Salvo Truck Lines-oEXWP <br /> - June.21, 1995 <br /> Pa$e_3. <br /> in SPI at a concentration of 18 mg/l. No—other petroleum hydrocarbon's were-detected at or above the - - <br /> reported laboratory detection limits in:the-groundwater samples collected-from:SPI; SP2 or SP4. <br /> Based on.the results.caf_the soil probe investigation, Condor recomrnended'in-the Site Investigation <br /> Report, dated'March 9; 1995, that the soil contamination-above c static water e'v:lLbe.investigated-and <br /> removed,by over-excavation.' SjCPFIS,EHD concurred with Condor's recommendations, with"the <br /> modification that over-excavation continue below the static water level and that impacted groundwater in <br /> the excavation be removed: <br /> 3.0 :PROPOSED SCOPE OF:WORK <br /> Condor will monitor theaver excavation and dewatering of contaminated soil and groundwater <br /> associated with 2 USTs formerly -located at the site. .Previous investigations indicate the lateral,extent of: <br /> soil contamination associated with the USTs encompasses an area approximately 60 feet by 70 feet.,-The <br /> estimated lateral-extent ofsoil,eontammation 1s.shown-on-Figure 2, Appendix A Approximately 2,000 to <br /> 2;500 cubic yardsof soil will be removed.during over-excavation <br /> The over-excavation will proceed`in stages..:.The initial stage will involve site preparation to <br /> manage storage of excavated soil This will be followed by the'over-excavation of soil near the south end <br /> of the former}location of TKl to below the static wateraevel.__One groundwater sample will .then-be <br /> collected from the open excavation-to evaluate options for groundwater disposal. Based ori the results of <br /> the laboratory analyses, over=excavation will resume or additional measures will be proposed to dispose of <br /> hydrocarbon impacted water. <br /> 3.1 -Site Preparation <br /> ...-,-.Site preparationwill include the construction of a containment area capable of storing 200.to.,40� <br /> cubic yards of saturated soil. The containment area will:measure approximately 40�.feet 6y'54 feet. 'The <br /> area will be covered with a 4 toY8'inch layer of clean soil and soil'berms will -be:constructed on.3 sides of._ <br /> the containment area.- Straw bails will be pfaced erid'.to end on top of the berms ' Three-layers of p <br /> f sheeting will be placed on top of the ground surface and secured. A second stockpile area will-b 2 <br /> L constructed to contain.soil excavated from above the static water level and suspected of hydrocarbon <br /> - 3 a s .. <br /> contamination. The stockpiled soil will°be placed'on, and covered with plastic sheeting. A third stockpille 5 1 <br /> will consist of soil that has not been .impacted by petroleum hydrocarbons .based.-on:field observations and <br /> Li_ . <br /> t CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.