Laserfiche WebLink
m <br /> T. - ' ¢ _ - <br /> Di.Salvo Truck-Eines=OEXWP <br /> . - - _ -- -- -_- June 21. 1995 <br /> Page-5- <br /> 1 <br /> 6.0 SCHEDULE <br /> Over-excavation of the site can begin after,this work"planhas.been approved by SJCPHS;EHD <br /> and authorization to proceed'has^•been obtained fr m Di Salvo Truck Eines:"Work may begin within <br /> 10 days-af final:authorization to proceed ?Over excavation and backfilling of the site will require <br /> approximately 10 working_days and,a final-report can be submitted approximately 3Q days following <br /> receipt of Laboratory;results.. _ <br /> -_ 7.0 REPORTS _ <br /> A number of documents produced-from the activitiesoutlined in this work;plan will be <br /> incorporated into an'investigation report to^be presented to the SJCPHS;EHDby OES The report will <br />�r - _ <br /> include a chronologyµof activities'conducted 'on-site, geological cross-sections illustrating-the <br /> subsurface profile and a scaled-map shaving the locations of all-sample (acations, existing buildings. <br /> and_other site-improvements: The report.will-also include a-presentation and interpretation of the., <br /> analytical data and recommendations for further investigation and/or remediation, as required ry <br /> s <br /> - Respectfully submitted, <br /> 592 <br /> :. - - .. •No.51 � <br /> Exp.6130198 <br /> _ Marc R=Crum __ _ Robert J ,-P ILPT <br /> Geologist-. - _ =Califo Registere ArF0 CA��Fe�. <br /> Professional Eif'ineer, Civil - <br /> _- - #51592 <br /> DISALVOWENTUPWWOAKPLAN.OFx — - <br /> CONDOR <br />