Laserfiche WebLink
I1 <br /> k 601 South Ventura <br /> Chronology Page 2 <br /> 1994 <br /> 9124194 Stockpiled soil samples were collected to confirm that treatment by aeration <br /> was complete. Soil contamination was not detected. <br /> 1995 <br /> 1/4/95 Monitoring well, MW 1 R was installed. <br /> 1/12/95 Monitoring well, MW 1 R was redrilled and replaced. The casing was <br /> obstructed apparently due to subsidence of the soil used for backfill. <br /> 1996 <br /> Groundwater samples were collected to verify that the.remedial efforts were successful. A <br /> closure report was prepared and closure recommended. <br /> 8/28198 Monitoring wells were destroyed. <br />