My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VENTURA
>
601
>
3500 - Local Oversight Program
>
PR0545791
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 1:34:22 PM
Creation date
6/15/2020 1:29:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545791
PE
3528
FACILITY_ID
FA0005880
FACILITY_NAME
PS BAJWA INC
STREET_NUMBER
601
Direction
S
STREET_NAME
VENTURA
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
601 S VENTURA AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n 1 . <br /> Working To Restore Nature <br /> 1710 Main Street <br /> Escalon, CA 95320 <br /> Phone: (209) 838-3507 <br /> FAX: (209) 838-3509 July 16, 1993 <br /> Mr. John Dieckman <br /> McAllister Trust <br /> 500 Airport Blvd., Suite 200 <br /> Burlingame, CA 94010 <br /> RE: Proposal and Estimated Budget <br /> Soil Excavation - McCallister Trust <br /> Stockton, California <br /> PHS/EHD Site Code 1275 <br /> Dear Mr. Dieckman: <br /> At your request, RESNA Industries (RESNA) prepared this proposal and an estimated <br /> budget for the above referenced project. The purpose of the proposed work is to remove soil <br /> that has been impacted in the vicinity of former underground fuel storage tanks. <br /> PROPOSED SCOPE OF WORK <br /> The proposed scope of work includes the follo ' g tasks: <br /> • Task 1. Excavate Soil/Collec Samples <br /> m - Task Z. Soil Pile Characterizition Sampling <br /> • Task 3. Preparation of Summary Report <br /> • Task 4. Soil Aeration and C nfirmation Soil Pile Sampling <br /> 0 Task 5. Backfilling <br /> Task J. Excavate Soil/Collect Samples <br /> Under this task, work will include: scheduling f field personnel; mobilization to the site; <br /> supervision of excavation activities; collecting and analyzing soil and water samples; cleaning-up <br /> the site; demobilization. <br /> psoi.rxc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.