Laserfiche WebLink
Farmington Groundwater Recharge Program STC Work Plan—Hammer Site <br /> LIST OF FIGURES <br /> Page <br /> Figure 1 Hammer Site Location Map 1-2 <br /> Figure 2 Property Boundaries and Potential Source Water Locations 2-3 <br /> Figure 3 Borehole and Potential Source Water Locations 2-4 <br /> Figure 4 Monitoring Well Construction Diagram 2-7 <br /> Figure 5 Design Schematic for the Flooded Field Type Direct Recharge 2-10 <br /> Figure 6 Example Flooded Field Type Direct Recharge 2-11 <br /> Figure 7 Design Schematic for the Deepened Pit Type Direct Recharge 2-12 <br /> Figure 8 Example Deepened Pit Direct Recharge 2-13 <br /> MWH iii July 2004 <br />