Laserfiche WebLink
Farmington Groundwater Recharge Program STC Work Plan—Hammer Site <br /> 3. REPORTING <br /> Upon completion of pilot recharge testing, a thorough review of data will be conducted. <br /> Collected data will be summarized in the form of graphs and tables to show trends and <br /> cumulative effects over time. The following is a brief summary of subjects which will be <br /> included in the reporting: <br /> • A summary of monitoring well and boring lithologic and construction details; <br /> • Plots of evaporation and precipitation volumes over time; <br /> • Plots of pond height levels over time; <br /> • Plots of pond infiltration rates over time; <br /> • Comparisons of soil type, grain size distribution, and infiltration efficiency; <br /> • Plots of groundwater elevation in the site monitoring well over time; <br /> • Plots of cumulative and daily percolation volumes; <br /> • Observations of changes in water quality field parameters; and <br /> • A summary of pilot recharge testing activities. <br /> MWH 3-1 July 2004 <br />