Laserfiche WebLink
MONITORING AND REPORTING OGRAM NO. -2- <br /> VAN RUITEN-TAYLOR RANCH LTD. <br /> VAN RUITEN-TAYLOR WINERY LLC <br /> SAN JOAQUIN COUNTY <br /> Constituent Units Type of Sample Sampling Reporting <br /> Frequency Frequency <br /> pH pH units Grab Weekly Monthly <br /> BODS' mg/L Grab Monthly Monthly <br /> Nitrate as Nitrogen mg/L Grab Monthly Monthly <br /> Total Kjeldahl Nitrogen mg/L Grab Monthly Monthly <br /> Total Dissolved Solids mg/L Grab Monthly Monthly <br /> Volatile Dissolved Solids mg/L Grab Monthly Monthly <br /> 1 Five-day,20°Celsius Biochemical Oxygen Demand. <br /> STORMWATER POND MONITORING <br /> The stormwater pond shall be monitored whenever there is water in it. Samples shall be collected from <br /> an established sampling station located in an area that will provide representative samples. Monitoring <br /> of the pond shall include, at a minimum, the following: <br /> Sampling Reporting <br /> Constituent Units Type of Sample Frequency Frequency <br /> pH pH units Grab Weekly Monthly <br /> Electrical Conductivity µmhos/cm Grab Weekly Monthly <br /> Total Dissolved Solids mg/l Grab Monthly Monthly <br /> Nitrate as Nitrogen mg/1 Grab Monthly Monthly <br /> Total Kjeldahl Nitrogen mg/l Grab Monthly Monthly <br /> BODS mg/l Grab Monthly Monthly <br /> LAND APPLICATION AREA MONITORING <br /> The Discharger shall monitor process wastewater discharged for irrigation to the land application area. <br /> Monitoring shall be conducted daily during operation and the results shall be included in the monthly <br /> monitoring report. Evidence of erosion, field saturation, runoff, or the presence of nuisance conditions <br /> shall be noted in the report. Loading rates for the land application areas shall be calculated. <br /> Monitoring of the land application areas shall include the following: <br /> Typeof Sampling Reporting <br /> Constituent Units Sample Frequency Frequency <br /> Wastewater Flow Gallons Continuous) Daily Monthly <br /> Supplemental Irrigation Flow Gallons Continuous' Daily Monthly <br /> Acreage Applied Acres Calculated Daily Monthly <br /> Application Rate gal/acre-day Calculated Daily Monthly <br /> BOD Loading Rate lbs/acre-month Calculated Daily Monthly <br /> Total Nitrogen Loading Rate3 lbs/acre•month4 Calculated Monthly Monthly <br /> TDS Loading Rate lbs/acre•month4 Calculated Monthly Monthly <br /> 1 Continuous monitoring requires daily meter reading or automated data collection. <br /> 2 Land Application Area(s)in use shall be identified by name or number and the acreage provided. If a portion of an <br /> V:\San Joaquin_Non I S\StafnObrim nSan JoaqubnVwi Ruitcn-Taylor Winc WRP.doc <br />