My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
340
>
2900 - Site Mitigation Program
>
PR0545713
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:20 PM
Creation date
6/15/2020 2:29:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545713
PE
2965
FACILITY_ID
FA0013507
FACILITY_NAME
VAN RUITEN FAMILY WINERY
STREET_NUMBER
340
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05802005
CURRENT_STATUS
02
SITE_LOCATION
340 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Agional Water Quality Control Board <br /> Central Valley Region <br /> Robert Schneider,Chair <br /> Winston H.Hickox : <br /> Secretaryfor Gray Davis <br /> Sacramento Main Office Governor <br /> Environmental Internet Address: http://www.swrcb.ca.gov/—rwgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> ORDER NO. <br /> ATTACHMENT C <br /> ITEMS TO BE INCLUDED IN A MONITORING WELL INSTALLATION WORKPLAN AND <br /> A MONITORING WELL INSTALLATION REPORT OF RESULTS <br /> Prior to installation of groundwater monitoring wells, the Discharger shall submit a workplan containing <br /> the minimum listed information. Wells may be installed after staff approve the workplan. Upon <br /> installation of the monitoring wells, the Discharger shall submit a report of results, as described below. <br /> All workplans and reports must be signed by a registered geologist, certified engineering geologist, or <br /> civil engineer registered or certified by the State of California. <br /> Monitoring Well Installation Workplan <br /> A. General Information: <br /> Monitoring well locations and rationale <br /> Survey details <br /> Equipment decontamination procedures <br /> Health and safety plan <br /> Topographic map showing any existing monitoring wells, proposed wells, waste handling <br /> facilities, utilities, and other major physical and man-made features. <br /> B. Drilling Details: describe drilling and logging methods <br /> C. Monitoring Well Design: <br /> Casing diameter <br /> Borehole diameter <br /> Depth of surface seal <br /> Well construction materials <br /> Diagram of well construction <br /> Type of well cap <br /> Size of perforations and rationale <br /> Grain size of sand pack and rationale <br /> Thickness and position of bentonite seal and sand pack <br /> Depth of well, length and position of perforated interval <br /> D. Well Development: <br /> Method of development to be used <br /> Method of determining when development is complete <br /> Method of development water disposal <br /> California Environmental Protection Agency <br /> CCII Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br /> For a list of simple ways you can reduce demand and cut your energy costs,see our Web-site at http://www.swreb.ca.gov/rwgcb5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.