Laserfiche WebLink
LAMM'SRSVILLE SCHOOL DISTRICT <br /> Site Safety Plan <br /> October 16, 1491 <br /> 3.o INTRODUCTION <br /> 3.1 Back round Technology, Inc. <br /> Lammersville schoolDis riot/has <br /> reiainid Gatutheir rJLammersvilleSchool <br /> to perform California. <br /> facility located at 16555 West `Jon Sosten Road, Tracy, <br /> oundwater Technology, Inc. installed 5 monitoring wells 6/87 after a <br /> tank was removed at the Lammersville Schoo <br /> suspected leaking fuel l <br /> Gr <br /> During drilling, product odor was encountered in two wells. <br /> garage. 000 ppb (TPH) . <br /> In 10/88 only 1 well had dissolved gasoline at 8, <br /> sed installing an additional 3 wells <br /> Groundwater Technology, Inc. propo <br /> to assess the problem. <br /> 3•2 purpose <br /> ur of the site safety plan is to provide Groundwater <br /> Thep pose personnel and subcontractors with an understanding of <br /> Technology field p h sisal hazards that exist or may <br /> the potential cheruical and pest are being performed. <br /> while the tasks of this pro? <br /> s to resent at <br /> This SSP deS�sabestohpotentialrhealthbhazardswwhich may ed in ebetp reduce <br /> employee exp enc: response procedures necessary t <br /> the project site. The emergency <br /> respond to such hazards are also described within this 55P. <br /> 3.3 Ob�e�_Gtive <br /> ive is to ensure the well.-being of all field <br /> object <br /> The primary this site. In order to <br /> personnel and the community sur androuapproved subcontractors shall <br /> accomplish this, project staff and app <br /> acknowledge and adhere to the policies and procedures established <br /> personnel <br /> herein. Accordingly, <br /> all p assigned to this project shall read <br /> this site safety plan and sign the Agreement and Acknowledgement <br /> Statement (Appendix A) to certify that they have read, understood and <br /> agreed to abide by its provisions. <br /> TI penel have the authority to stop work performed by our sub <br /> GTI rson <br /> - <br /> pe dors at this site if any work is not performed in accordance <br /> of this Site Safety Plan. <br /> with the requirements <br /> 3.4 Amend?merts <br /> Any changes in the scope of work of this projethe ct and/or site conditions <br /> Plan <br /> must be amended in wroVedgbynHealth lSeSafety <br /> SafetyManagermendment Sheet <br /> (Appendix B) and appr <br />