My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012646
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VON SOSTEN
>
16555
>
3500 - Local Oversight Program
>
PR0545795
>
ARCHIVED REPORTS_XR0012646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 5:43:17 PM
Creation date
6/15/2020 2:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012646
RECORD_ID
PR0545795
PE
3528
FACILITY_ID
FA0002952
FACILITY_NAME
LAMMERSVILLE SCHOOL
STREET_NUMBER
16555
STREET_NAME
VON SOSTEN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20914009
CURRENT_STATUS
02
SITE_LOCATION
16555 VON SOSTEN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` r Y <br /> i <br /> LAMMERSVILLE SCHOOL DISTRICT <br /> Site Safety Plan <br /> October 16, 1991 <br /> 10.0 PROJECT PERSONNEL <br /> Groundwater Technology, Inc. will oversee and act accordingly during <br /> all phases of the project. The following management structure will be <br /> instituted for the purpose of successfully and safely completing this <br /> project. <br /> 10.1 Project Manager: <br /> SCOTT E. GABLE <br /> The Project Manager will be responsible for implementing the project <br /> and obtaining any necessary personnel or resources for the completion <br /> of the project. Specific duties will include: <br /> • coordinating the activities of all subcontractors, to include <br /> informing them of the required personal protective equipment <br /> and ensuring their signature acknowledging this Site Safety <br /> Plan (see Appendix A) , <br /> • selecting a Site Safety Officer and field personnel for the <br /> work to be undertaken on site, <br /> • ensuring that the tasks assigned are being completed as planned <br /> and on schedule, <br /> • providing authority and resources to ensure that the Site <br /> Safety officer is able to implement and manage safety <br /> procedures, <br /> • preparing reports and recommendations about the project to <br /> clients and affected Groundwater Technology, Inc. personnel, <br /> • ensuring that persons allowed to enter the site (i.e. , EPA, <br /> contractors, state officials, visitors) are made aware of the <br /> potential hazards associated with the substances known or <br /> suspected to be on site, and are knowledgeable as to the <br /> on--site copy of the specific site safety plan. <br /> ensuring that the Site Safety Officer is aware of all of thEl. <br /> provisions of this site safety plan and is instructing all <br /> personnel on site about the safety practices and emergency <br /> procedures defined in the plan, and <br /> • ensuring that the Site Safety Officer is making an effort to <br /> monitor site safety, and has designated a Field Team Leader to <br /> assist with-the_responsibility-when necessary. - - -- --- <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.