Laserfiche WebLink
-M-T' Vil <br /> i <br /> Kenneth Olds <br /> November 15, 1988 <br /> 202/799-5055 <br /> Page <br /> 4 <br /> static water level <br /> in the well was about 2.5 feet above the top <br /> Of the screened interval. <br /> This <br /> caused dissolved hydrocarbon levsituation is thought to have <br /> els in <br /> from MW-1 to be non-representative of the water sample collected <br /> in the upper part of the aquifer. hydrocarbon concentrations <br /> Dissolved TPH asdi; <br /> esel concentrations ranged from 72 AAb in <br /> -1 and 50 ppb in M,1-4 to non-detectable in <br /> wells. These levels the <br /> indicate no si remainin g three <br /> gnificant contamination of <br /> groundwater by diesel in the existing <br /> was detected in the analyzed water samplestoand gtotal slead o EDB <br /> were either below or near the method detection levels <br /> - limits. <br /> In summary, hydrogeolo <br /> the five a gic and chemical data obtained <br /> g wells in November <br /> 1988, indicatedcated 1987 and September/oc ober <br /> that m <br /> the dissolved TPH as gasoline plume did not <br /> extend during this period to <br /> gradient from the tank <br /> and MW-4, which are located u <br /> tank pit, nor did it extend northward P <br /> hward to <br /> However, down gradient from the. tank � �-5' <br /> diesel tank, the impact on Pit and from the underground <br /> groundwater, if any, is not defined. <br /> In order to define <br /> hydrocarbon the dowrzgradient extent of the dissolved <br /> plume, GTI recommends drilling three additional <br /> boreholes and installing <br /> the ro monitoring wells in them. Locations of <br /> A posed monitoring wells are shown <br /> in Figure 1 . Selected <br /> soil samples collected <br /> during drilling of the boreholes would be <br /> analyzed for TPH as <br /> gasoline and diesel, and BTEX concentrations.--- <br /> The three new we.3l,s__ <br /> would--- ---- <br /> y for elevation control. A <br /> round of groundwater monitoring and sam !in of <br /> well; associated with the A g all monitoring <br /> sam les Project would be performed. The water <br /> A would be analyzed for BTEX and TPH as <br /> � - gasoline and <br /> diesel. <br /> The updated hydrogeologic and chemical data would <br />