My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012646
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VON SOSTEN
>
16555
>
3500 - Local Oversight Program
>
PR0545795
>
ARCHIVED REPORTS_XR0012646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 5:43:17 PM
Creation date
6/15/2020 2:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012646
RECORD_ID
PR0545795
PE
3528
FACILITY_ID
FA0002952
FACILITY_NAME
LAMMERSVILLE SCHOOL
STREET_NUMBER
16555
STREET_NAME
VON SOSTEN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20914009
CURRENT_STATUS
02
SITE_LOCATION
16555 VON SOSTEN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
... .� ._ ,, ! ., 4 <br /> µ letter GTI was contacted by the district and told to correct the <br /> problem concerning the rejection of the Problem Assessment Report. <br /> n <br /> plan to re-camp <br /> October 18, 1990, GTI submitted a work p . required <br /> soil borings-23 On December 17 , 1990, the rovalrfor thecontactedMs. <br /> tng <br /> Margaret Lagorio on what was delaying the app <br /> ' of soils at monitoring wells 6 , 7, and S. She indicated that she had <br /> ter, to her secretary on December 6 to be typed concerning <br /> given a let <br /> this matter and that she would give a verbal ok to the work plan <br /> site. She further indicated that she <br /> submitted by UTI on reboring the <br /> with a letter. When <br /> would follow the verbal approval up plan. <br /> The <br /> completed, GTI could complete their work on the clean up <br /> district contacted Mr. Bob Bird <br /> dof GTI Land <br /> relayed M to MrS. �oBird sthat <br /> ahead. from the county" . <br /> The it wanted this project brought to a speedy conclusion- <br /> Ms. Lagorio sent a letter to the district dated December 17, <br /> 1990, indicating that permits would need obebtained,c48onour <br /> me <br /> notice to her office prior to soil boring, ofstrand the <br /> uiof <br /> 15 <br /> boring holes, the submission of a health and x , 199 24 <br /> submission of a draft Final Remedial Plan by March 15, <br /> On February 20, 1991 , the district contactedldTIasnot gto tthe <br /> pelat <br /> in the reboring. GTI indicated that theyfrom GTI had <br /> from the county until a workers compensation certificatestill had not <br /> been submitted. They complied with the request, in <br /> but received the permit, The <br /> district <br /> istr ctCOntacindicateddthatSJCPHS theapermits tohwas einythe <br /> issuing the permit. e <br /> county' mail. <br /> On March 6, 1991, new soil samples were taken at the site by GTI. <br /> The completed Problem Assessment Report dated April 19, 1991, was <br /> d e <br /> submitted to the district and SJCPHS for review an1991,itindicating <br /> district received a letter from SJCPHS dated July I1, current <br /> that they agreed with GTI's Problem Asnessment Report but " • • <br /> data shows the contaminated groundwater has moved and more site <br /> investigation is needed to establish the extenteodf contamination n <br /> , theSJCPHS <br /> _ appropriate remediation plan can be develop .gation by additional <br /> agency required an additional work plan, <br /> investimonitoring wells and finally a draft Remedial Action Pian The agency also has <br /> extent of the contamination had been defined. ly sampling of the <br /> requested additional reports concerning the quarter <br /> monitoring wells." <br /> The district contacted Ms. Margaret Lagorio of SJCPHS on August <br /> 5, 1991, and asked for a meeting of the SJthis, CVRWprojocB, Senator <br /> After <br /> Patrick Johnston, and the district concerning of two weeks' it was determined <br /> several phone calls over the space <br /> that a meeting was not forthcoming as Mr. Gordon Boggs of CVRWQCOf <br /> B <br /> T would not attend a <br /> meeting unless he 1�Pepresentativethe <br /> fromeCSenator <br /> the meeting. Ms. Carol HemminSer, p <br /> - - - -- y on this project_ be <br /> that a historbe completed <br /> and what specific results would-the-district-desire- -at_-the-cone-ust <br /> of a meeting with the various agencies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.