My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012646
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VON SOSTEN
>
16555
>
3500 - Local Oversight Program
>
PR0545795
>
ARCHIVED REPORTS_XR0012646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 5:43:17 PM
Creation date
6/15/2020 2:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012646
RECORD_ID
PR0545795
PE
3528
FACILITY_ID
FA0002952
FACILITY_NAME
LAMMERSVILLE SCHOOL
STREET_NUMBER
16555
STREET_NAME
VON SOSTEN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20914009
CURRENT_STATUS
02
SITE_LOCATION
16555 VON SOSTEN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
qq <br /> t <br /> • ` �.` A .ys J -x. S. `n <br /> s <br /> • v <br /> y <br /> L-d <br /> Mr. Kenneth Olds <br /> January 25, 1989 <br /> 202/029000-301 <br /> Page 2 <br /> Submit water samples to an analytical laboratory for <br /> analyses of BTRX, and TPH as gasoline and diesel <br /> concentrations. <br /> The hydrogeologic and chemical data would be used to <br /> prepare a Problem Assessment Report. <br /> GTT believes that the proposed work steps would cost-effectively <br /> provide the information necessary to proceed to the final <br /> remediation phase of the investigation as required by the CRWQGB- <br /> GVR. <br /> The following breakdown reflects the anticipated costs for <br /> implementation of the proposed work steps. <br /> ESTIMATED COST <br /> WORK STEPS <br /> Drilling and installation of three $ 4,400,00 <br /> monitoring wells <br /> Well surveying, monitoring, purging/ $ 1,Q40.00 <br /> development, sampling <br /> Laboratory analyses of sail and water $ 11960.00 <br /> samples <br /> Problem Assessment Report <br /> $ 2,800.00 <br /> Project organization, QA/QC, site <br /> $ <br /> safety X600.00 <br /> TOTAL ESTIMATED COST $11,820.00 <br /> GTI would provide the proposed services on a time and materials <br /> basis for a maximum fee of $ 11,820.00, which would not be <br /> exceeded without prior authorization by Mr. Olds. Services would <br /> be billed in accordance with the enclosed Professional Rate <br /> Schedule. The above cost estimate does not include containment <br /> and/or disposal of contaminated soil and groundwater, and/or <br /> permitting fees associated with the project (which would be <br /> billed at their actual cost) . <br /> ----- -- - - ----- Durin the-drilling--operations, GTI would make every reasonable <br /> effort to avoid underground <br /> site. However, GTI will not be responsible for utilities or improvementsge -the----- - - <br /> damage to any <br />
The URL can be used to link to this page
Your browser does not support the video tag.