Laserfiche WebLink
F <br /> 2021899.7004 <br /> for, Greg Lyon Page 2 <br /> October 18, 1990 <br /> The hand auger,impact sampler and brass tubes will be washed with detergent and rinsed with distilled <br /> watr prior to each hatsampling le will bk <br /> hole. No paving will be needed because theholeswill belocatedtmaterialh native <br /> in unpa edareageneratedfrom <br /> EHD will be notified 48 hours prior to the soil-sampling activities. It is estimated that the field activities will <br /> ._ take approximately 3 hours to complete. Groundwater Technology is prepared to complete these work <br /> steps as soon as this work plan is approved by EHD. <br /> Please call our West Sacramento office if you have any questions or require additional information <br /> regarding this work plan. <br /> Sincerely, <br /> GROUNDWATER TECHNOLOGY, INC. <br /> ED K. SIMONIS <br /> California Registered <br /> Geologist No.4422 <br /> Lo►7�^'" rr " <br /> ROBERT H. BIRD <br /> Senior Scientist <br /> Project Manager <br /> EKS/RHB:rc <br /> cc: Mr. Kenneth Olds <br /> Lammersville School District <br /> 16555 West Von Sosten Road <br /> Tracy, CA <br /> GROUNDWATER <br /> TECHNOLOGY.INC. <br />