Laserfiche WebLink
SiNp-23-02 04: 36P SIER' PACIFIC GROUP 916 33 3197 P. 05 <br /> Table 1. Selected Work Plans, Reports,and Letters <br /> NPDF..S Storm Water Pollution Prevention Plan: Condor Earth Technologies, Inc., 12 April 1994. <br /> Soil Sampling Work flan, Cargill Puri Road No. 8 Molasses Deed Product Faeility, Stockton California: <br /> Sierra-Pacific Groundwater Consultants, inc,, I 1 January 1996. <br /> :Site Health and.S'ctfety Plan, C;arl;•ill fort Ruud,Nv. b'Molasses Feec!Product Facility, .Stockton, (M <br /> Oniz <br /> Sierra-Pacific GroundwaterConsultants, Inc., 19 March 1996, <br /> Work Plan, Installailon of Monitoring Wells (CW-01, CIV-02, and ( W-03), Cargill Port Road No. 8 <br /> Molasses Feed Product Facility, Stockton, Calffbrnia: Sierra-Pacific Gro undwater'Consultants, <br /> Inc., 11 January 1996. <br /> Results of Soils Investigation, Cargill Port Road No. b' Molasses Feed Product Facility, Stockton, <br /> C,ulifornia: Sierra-Pacific Groundwater Consultants,Inc., 29 May 1996, <br /> Work Plan, Facility Demolition and.Said Excavation, Cargill Port Road No. 8 Molasses Deed Product <br /> Facility, Stockton, California: Sierra-Pacific CTroundwater Consultants, Inc.,20 September 1996. <br /> The Origin and Distribution of Mineralized Ground Water at the Puri Road No. 8 Molasses reed Product <br /> Facility, Pori qf Stockton, California: Sierra-Pacific Groundwater Consultants, Inc., Gary <br /> Rimmey Letter, IS September 1996. <br /> Installation Report, Monitoring Wells(C37-0.1,0.1. CW-02,and(_'W-0.1), Cargill, Inc. Port Road M), 8 Facility, <br /> Stockton, C'Wifornia: Sierra-Pacific Groundwater Consultants, Inc., 15 November 1996, <br /> Fourth-Quarter 1996 Monitoring Report (11120196 Sampling Event): Sierra-Pacific Groundwater <br /> Consultants,Inc.,6 January 1997. <br /> :Sampling Method l,vr C'hctracter-ization of Waste.Sails at C:argill's Port Road No. 8 Molasses-Based Deed <br /> Product P-4cility, .Stockton, C'alifhr•nia: Sierra-Pacific Groundwater Consultants, Inc., 11 <br /> l'ebruary 1997. ('Phis brief'work plan includes subsequent laboratory test results). <br /> First-Quarter 1997 Monitoring Report (021041.97 Sampling Event): Sierra-Pacific C_1roundwater <br /> Consultants,Inc., 6 March 1997. <br /> Request For Conditional tiite Closure at Cargill's Former Molasses!Feed Product 1+'acility, Port Road No. <br /> 8, Stockton. C.allfornia: Sicrra-Pacific Groundwater Consultants, Inc:., RWQCl3 Letter, 21 April <br /> 1997(Herein). <br /> Sierra-Pacific Groundm Ater Consultants, Inc.. <br />