SiNp-23-02 04: 36P SIER' PACIFIC GROUP 916 33 3197 P. 05
<br /> Table 1. Selected Work Plans, Reports,and Letters
<br /> NPDF..S Storm Water Pollution Prevention Plan: Condor Earth Technologies, Inc., 12 April 1994.
<br /> Soil Sampling Work flan, Cargill Puri Road No. 8 Molasses Deed Product Faeility, Stockton California:
<br /> Sierra-Pacific Groundwater Consultants, inc,, I 1 January 1996.
<br /> :Site Health and.S'ctfety Plan, C;arl;•ill fort Ruud,Nv. b'Molasses Feec!Product Facility, .Stockton, (M
<br /> Oniz
<br /> Sierra-Pacific GroundwaterConsultants, Inc., 19 March 1996,
<br /> Work Plan, Installailon of Monitoring Wells (CW-01, CIV-02, and ( W-03), Cargill Port Road No. 8
<br /> Molasses Feed Product Facility, Stockton, Calffbrnia: Sierra-Pacific Gro undwater'Consultants,
<br /> Inc., 11 January 1996.
<br /> Results of Soils Investigation, Cargill Port Road No. b' Molasses Feed Product Facility, Stockton,
<br /> C,ulifornia: Sierra-Pacific Groundwater Consultants,Inc., 29 May 1996,
<br /> Work Plan, Facility Demolition and.Said Excavation, Cargill Port Road No. 8 Molasses Deed Product
<br /> Facility, Stockton, California: Sierra-Pacific CTroundwater Consultants, Inc.,20 September 1996.
<br /> The Origin and Distribution of Mineralized Ground Water at the Puri Road No. 8 Molasses reed Product
<br /> Facility, Pori qf Stockton, California: Sierra-Pacific Groundwater Consultants, Inc., Gary
<br /> Rimmey Letter, IS September 1996.
<br /> Installation Report, Monitoring Wells(C37-0.1,0.1. CW-02,and(_'W-0.1), Cargill, Inc. Port Road M), 8 Facility,
<br /> Stockton, C'Wifornia: Sierra-Pacific Groundwater Consultants, Inc., 15 November 1996,
<br /> Fourth-Quarter 1996 Monitoring Report (11120196 Sampling Event): Sierra-Pacific Groundwater
<br /> Consultants,Inc.,6 January 1997.
<br /> :Sampling Method l,vr C'hctracter-ization of Waste.Sails at C:argill's Port Road No. 8 Molasses-Based Deed
<br /> Product P-4cility, .Stockton, C'alifhr•nia: Sierra-Pacific Groundwater Consultants, Inc., 11
<br /> l'ebruary 1997. ('Phis brief'work plan includes subsequent laboratory test results).
<br /> First-Quarter 1997 Monitoring Report (021041.97 Sampling Event): Sierra-Pacific C_1roundwater
<br /> Consultants,Inc., 6 March 1997.
<br /> Request For Conditional tiite Closure at Cargill's Former Molasses!Feed Product 1+'acility, Port Road No.
<br /> 8, Stockton. C.allfornia: Sicrra-Pacific Groundwater Consultants, Inc:., RWQCl3 Letter, 21 April
<br /> 1997(Herein).
<br /> Sierra-Pacific Groundm Ater Consultants, Inc..
<br />
|