Laserfiche WebLink
Jan-05-96/67:46A Surra-Pacific Grnd 11 water 916 933-3197 P-02 <br /> J � 916 485 @?95 P.02x02 LING <br /> I <br /> REYLIK DRILLING, INCe <br /> 3429 Longview Drive, North Highlands, CALIFORNIA 95660 , (916) 465-IY792 FAX(916)485-0795 <br /> January 3, 1996 <br /> R. <br /> Mr. John Rapp 4-6 o�- <br /> Sierra-PaCfiC Groundwater Consultants R i1 <br /> 4911 Wrndplay Drive, Suite A /oil <br /> EI Dorado Hills, CA 95762- <br /> Subject: <br /> 5762Subject; Repair of MW-T 1836 North Sutro Avenue, Stockton, CA. Sierra Pacific <br /> Project No. 94-055.093, Beylik Job 8424 <br /> Dear John, <br /> Pursuant to your request, Beylik Drilling, Inc. is pleased to provide the following outline <br /> of the proposed scope of work to repair the subject well_ <br /> A. Rig up on the well, drill inside the 47 PVC casing and drill through the cement <br /> plug at 154 ft, The drilling will be direct rotary with clean water. If the <br /> material under the plug is sand,salt and/or heavy drilling mud.we will <br /> circulate it out and develop the well. If the cement plug is solid from 154 ft. to <br /> 174 ft. we will drill out the casing as described in Item B- <br /> B. If the cement plug goes to the bottom of the casing we will drill out the <br /> borehole inside the permanent conductor to,the original diameter using an <br /> engineered hole-opener bit. We will then construct the well with 20 ft. of <br /> screen and 152 ft. for blank$ch. 46 PVC casing. The sand pack will be <br /> installed from 172 to 145 It. A high`solids volctay grout will be Installed from <br /> 145 ft_ to 100 ft. Then a neat cement grout will be installed to surface_ <br /> C- The well will be developed per the original spect8catiorns. <br /> If you have any questions or meed additional information, please contact me. <br /> s" ce <br /> illings ill, PE <br /> Division Manager <br /> Beylik Drilling, Inc. <br /> STATE OF CALIFORNIA CONTRACTOWS NO. 3tlf,9a+.r_S7 tt cr.�+ <br /> TOTAL P.02 <br /> I <br />