Laserfiche WebLink
RECEIVED <br /> QCT 2 1 2013 <br /> • One sample analyzed in duplicate for every ten samples, batch of samples 4EW R 1'AL <br /> whichever is more frequent. �+�T JFRE f�r9kNT <br /> • One spiked sample for every ten samples, batch of samples or type of matrix, whichever is more <br /> frequent,with the spike made at ten times the detection limit or at the analyte level. <br /> ATL will be instructed to homogenize the soil samples in accordance with contract specifications prior <br /> to analysis for metals. <br /> Report Preparation <br /> We will prepare a UST Site Investigation Report to present our findings and conclusions. The report <br /> will include the following: <br /> - Introduction/project description <br /> - Investigative methods <br /> - Investigative results and field observations <br /> - Conclusions and recommendations <br /> - Summarized laboratory data tables <br /> - Vicinity Map <br /> - Site Plan depicting boring locations <br /> - Site Photographs <br /> - Appendices including laboratory reports and COC documentation <br /> Caltrans will be provided with one copy of the draft report, and upon receipt and incorporation of <br /> Caltrans comments, we will provide two hard copies and two electronic copies (CD) of the finalized <br /> UST Site Investigation Report. <br /> Please contact us if you have any questions concerning the contents of this Workplan or if we may be <br /> of further service. <br /> Sincerely, �Q�®au <br /> GEOCON CONSULTANTS,INC. �O �Q <br /> fn <br /> Nm 46681 <br /> Josh Ewert, PG E. JjA end, PE, CEG <br /> Project Geologist Principal/Senior Engineer GFCA�-�� <br /> Attachments: Figure 1, Vicinity Map <br /> Figure 2, Site Plan <br /> Site Photographs(1 through 4) <br /> SJCEHD Notice to Abate <br /> Linden UST Site Investigation,TO No.4 Caltrans Contract 06A1895,EA No. 10-OY3600 <br /> Geocon Project No.S9800-01-04 -4- October 8,2013 <br />