Laserfiche WebLink
STATE OF CALIFORNIA• DEPARTMENT OF TRANSPORTATION <br /> BMP TAILGATE MEETING REPORT <br /> NPDES-001 (REV 1012017) - <br /> ACTION AND DISTRIBUTION: <br /> First line supervisor conducts meeting, completes,and signs form <br /> 2. First line supervisor retains and posts a copy <br /> 3. First line supervisor forwards a copy to second line supervisor for review and signature <br /> 4. Second line supervisor signs and returns the copy to first line supervisor to file in FPPP binder and forwards the copy to the <br /> Maintenance Storm Water Coordinator <br /> REGION OFFICE/YARD <br /> Lodi <br /> DATE OF MEETING COST CENTER <br /> 09/10/2018 10-2608 <br /> ATTENDANCE: <br /> Employee Name(Print) Employee Signature Employee Name (Print)/ mployee Signatur <br /> ee <br /> ``��� to i• -c <br /> �10.�1b✓. <br /> BMPs Discussed (List): <br /> Welding and Grinding <br /> 1 <br /> D) ther <br /> Suggestions for BMP Improvements <br /> APPLICATION ,The following procedures are used where welding and grinding work may pollute storm water runoff or discharge to storm <br /> water drainage system and watercourses. <br /> LIMITATIONS,The BMPs for this activity provide operating methods or measures only for the purpose of storm water pollution prevention. <br /> The applicable local,state and federal hazardous materials,employee safety and fire prevention requirements are not presented. <br /> Supervisor's Comments <br /> OPERATIONAL PROCEDURES, <br /> • Secure all equipment and tools.Prevent foreign objects from being dropped into the watercourse. <br /> •Use appropriate containment-when welding over the side-ofa bridgetocapture slag and metal grindings <br /> • ,For welding work over a storm drain inlet,protect the drain inlet to prevent grindings and debris fi-om entering the storm water drainage <br /> system or watercourses <br /> • .For welding work on the deck services or expansion plates,use maintenance traveler or wing staging to capture grindings and debris <br /> -.(Remove all slag and debris from the deck or other work sites when the job is completed. ) <br /> FIRST LINE SUPERVISOR(Print) SECO D INE SUPERVISOR (Print) <br /> F T LINE SUPERVI (Signature) DATE SECOND LINE SUPERVISOR (Signature) DATE <br /> 09/10/2018 09/10/2018 <br /> Forward completed copy to the District Maintenance Storm Water coordinator Post completed copy in crew room or FPPP book, <br /> keep copies for minimum of three(3)years. <br /> ADA Notice For individuals with sensory disabilities,this document is available in alternate formats. For alternate format information, contact the Forms <br /> Management Unit at(916)445-1233,TTY 711,or write to Records and Forms Management, 1120 N Street,MS-89,Sacramento,CA 95814. <br />