Laserfiche WebLink
Hazardous Materials Business Plans / CERS & Manifest Requirements <br /> Mu sL. N attmm �9i_m5�r.i. ,P�bomn— i'hr.uovimNYC l <br /> _- <br /> anifest <br /> +N�9JDe <br /> Ov <br /> erview <br /> �'f %� 1V.v )t ituirt�n <br /> • Manifest only available <br /> through an EPA-approved ,rt„ <br /> n" r� •owns liar m- .--. <br /> registered printer _ <br /> PI'!8M'81�^ <br /> Wtldk t'n u.nl b N.4H oN}Cp <br /> e re �oa�ero <br /> r,uea no � mxiaa <br /> ae <br /> w - suc mr� <br /> xtt <br /> r <br /> mu»ruaw <br /> _ rt <br /> *.. r hifest Overview <br /> d <br /> • A manifest must be completed by a generator when <br /> shipping hazardous waste (RCRA & non-RCRA) <br /> • RCRA and non-RCRA hazardous waste can be shipped <br /> on the same manifest form <br /> • Some hazardous wastes are exempt from using a <br /> manifest: <br /> • Universal waste, certain recyclable waste (e.g., contaminated <br /> containers, used oil filters, automotive batteries) <br /> 24 of 98 <br />