Laserfiche WebLink
Hazardous Materials Business Plans / CERS & Manifest Requirements <br /> Completionr <br /> • Manifest discrepancies: <br /> • Bulk wastes discrepancies apply when there are weight <br /> variations greater than 10% <br /> • Container wastes discrepancies apply when there is any <br /> variation in piece count <br /> • Designated facility is to try to reconcile discrepancy upon <br /> discovery <br /> • If discrepancy not reconciled within 15 days after receiving <br /> waste, designated facility must notify DTSC in writing <br /> 22 CCR 66265.72 <br /> c w,. <br /> Shipping Papers & <br /> -st Completion — <br /> . <br /> • Continuation sheet, EPA <br /> form 8700-22A <br /> • Generator is responsible <br /> for information in boxes 21 "—32 <br /> • Transporter (other than <br /> transporter one or two) is <br /> responsible for information <br /> in boxes 33—34 <br /> • Boxes 35— 36 are to be <br /> completed by designated <br /> facility (TSDF) y <br /> 30 of 98 <br />