My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003307
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BOZZANO
>
2851
>
2600 - Land Use Program
>
SA-89-23
>
SU0003307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 12:07:10 PM
Creation date
6/16/2020 11:47:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003307
PE
2633
FACILITY_NAME
SA-89-23
STREET_NUMBER
2851
STREET_NAME
BOZZANO
ENTERED_DATE
11/7/2001 12:00:00 AM
SITE_LOCATION
2851 BOZZANO
P_DISTRICT
000
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTEWATER RECLAMATION REQUIREMENTS -3- <br /> QUALITY ASSURED PACKING, INC. <br /> LINO BOZZANO, ALDO CORRADI , <br /> MR. LAGORRIO, LOUIE RUBINO & SONS, <br /> AND J&A SOLARI <br /> SAN JOAQUIN COUNTY <br /> 3. The use of process wastewater shall be confined at all times to <br /> property owned or controlled by the Reclaimer, as shown in <br /> Attachment 1 . <br /> 4. Process wastewaters used for irrigation shall be managed to minimize <br /> erosion and runoff. <br /> 5. Water shall not pond in fields. <br /> 6. Maintenance of the pipelines and spray irrigation systems shall <br /> include methods to prevent nuisance odors. <br /> C. Provisions: <br /> 1. The Reclaimer shall comply with Monitoring and Reporting Program No. <br /> which is part of Quality Assured Packing' s waste discharge <br /> requirements and is now part of this Order. <br /> 2. In the event of any change in control or ownership of land presently <br /> owned or controlled by the Reclaimer, the Reclaimer shall notify the <br /> succeeding owner or operator of the existence of this Order by <br /> letter, a copy of which shall be forwarded to this office. <br /> 3. The Board will review this Order periodically and may revise <br /> requirements when necessary. <br /> I , WILLIAM H. CROOKS, Executive Officer, do hereby certify the foregoing <br /> is a full , true, and correct copy of an Order adopted by the California <br /> Regional Water Quality Control Board, Central Valley Region, on <br /> WILLIAM H. CROOKS, Executive Officer <br /> TLL 5/21/90 <br /> Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.