My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:25:11 PM
Creation date
6/17/2020 11:32:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment <br /> Page 2 <br /> of existing maintenance shop building and excavation to a <br /> maximum depth of 25 feet below the ground surface. <br /> o November 3 , 1988- San Joaquin Health District responds to <br /> FS/RAP report in letter. Finds FS/RAP adequate providing <br /> certain considerations were addressed. <br /> o November 28, 1988- Dames & Moore submits response to <br /> November 3rd letter from San Joaquin addressing each of their <br /> stated concerns. Also submitted work plan for additional <br /> groundwater sampling and analysis. <br /> o January 18, 1989- San Joaquin submits letter to AFPC stating <br /> work plan incomplete due to unacceptable laboratory methods. <br /> o January 23 , 1989- Dames & Moore sends revised work plan to <br /> San Joaquin Health District for review. <br /> o January 24 , 1989- San Joaquin telecopies inappropriate lab <br /> methods to Dames & Moore. <br /> o January 26, 1989- Dames & Moore telecopies reply to San <br /> Joaquin. <br /> o January 27 , 1989- Diane Henson of San Joaquin verbally <br /> approves work plan. <br /> o January 30 , 1989- Dames & Moore resamples existing wells. <br /> No compounds detected. <br /> o February 17 , 1989- Dames & Moore submits report to San <br /> Joaquin presenting results of additional groundwater <br /> monitoring. <br /> o March 13 , 1989- Dames & Moore submits copy of FS/RAP <br /> report to Lorna Kirby of the Department of Health Services. <br /> o March through July 1989- Dames & Moore attempts to get <br /> response from San Joaquin. Many phone calls unanswered. <br />
The URL can be used to link to this page
Your browser does not support the video tag.