My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:25:11 PM
Creation date
6/17/2020 11:32:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sampling and Analysis Procedures Date: March 12, 2007 <br /> Health & Safety Procedures Date: March 12, 2007 <br /> Removal/Disposal Procedures Date: <br /> Removal Action Workplan Date: <br /> C. If site was abated by a responsible party, did the Department receive a signed <br /> statement from a licensed professional on all phases of the Remedial <br /> Actions? (indicate date of statement) <br /> Removal Action Workplan Date: <br /> Design & Construction Specifications Date: <br /> Post Construction Date: October 6, 2009 <br /> D. Did a registered engineer or geologist verify that acceptable engineering <br /> practices were implemented? <br /> Yes X No Name: Timothy Souther Date: October 6, 2009 <br /> E. Did the Department confirm completion of all Remedial Actions? <br /> Yes X No Date of verification: January 21, 2009, sampling <br /> (i.e. manifest, sampling, demonstrated installation and operation of treatment) <br /> F. Did the Department (directly or through a contractor) actually perform the <br /> Remedial Action? <br /> Yes No X Name of Contractor: <br /> G. Was there a community relations plan in place? Yes X No <br /> H. Was a remedial action plan or removal action workplan developed for this <br /> site? <br /> Yes _ No X <br /> I. Did DTSC hold a public meeting regarding the draft RAP or RAW? <br /> Yes No X <br /> J. Were public comments addressed? <br /> Yes X No Date of DTSC analysis and response: June, 2010 <br /> K. Are all of the facts cited above adequately document in the DTSC files? <br /> Yes X No <br /> If no, identify the areas where documentation is lacking <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.