My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:55:20 PM
Creation date
6/17/2020 11:34:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pl ►� � �, til� Sys l"�lur� <br /> CONTENTS <br /> A1.0 SAMPLING DESIGN......................................................................... ............................................1 <br /> Al.l Analytical Methods................................................................ ............................................1 <br /> A1.2 Sampling Methods and Procedures........................................ ............................................1 <br /> A1.2.1 Sample Types............................................................ ............................................2 <br /> A1.2.2 Soil Samples.............................................................. ............................................2 <br /> A1.2.2.1 Excavation Soil Sampling...................... ............................................2 <br /> A1.2.2.2 Surface and Shallow Soil Sampling....... ............................................3 <br /> A1.2.2.3 Trenching Subsurface Sampling............ ............................................3 <br /> A1.2.3 Water Samples.......................................................... ............................................4 <br /> A1.2.3.1 Groundwater Sampling.......................... ............................................4 <br /> A1.2.3.2 Surface Water Sampling.........................41............................................4 <br /> A1.2.4 Sediment Sampling................................................... ............................................4 <br /> Soil <br /> A1.2.5 51 Temporary Probe Installation................. 5 <br /> Al <br /> VaporSampling.................................................f............................................ <br /> A1.2.5.2 Pre-Sample Purge................................... ............................................5 <br /> A1.2.5.3 Sample Collection.................................. ............................................6 j <br /> A1.2.5.4 Temporary Probe Abandonment............ ............................................7 I <br /> A1.3 Quality Control(QC) Samples............................................................................................7 <br /> A1.3.1 Trip Blanks.............................................................................................................7 <br /> A1.3.2 Field Duplicate Samples ........................................................................................7 <br /> A1.3.3 Matrix Spike and Matrix Spike Duplicate Samples...............................................8 <br /> AlA Decontamination Procedures...............................................................................................8 <br /> A1.5 Sample Handling and Custody............................................................................................8 <br /> A1.5.1 Sample Labeling........................................................ ............................................8 <br /> A1.5.2 Sample Packaging and Shipment.............................. ............................................9 <br /> A1.5.3 Field Documentation................................................. ............................................9 <br /> A1.5.3.1 Chain of Custody(COC)Record........... ............................................9 <br /> A1.5.3.2 Field Logbooks..................................... ..........................................10 <br /> A1.5.3.3 Document Corrections.......................... ..........................................11 <br /> TABLE <br /> 1 Sampling and Analysis Plan <br /> K1361125 APPENDIX A MACTEC Engineering and Consulting, Inc. Ai <br /> September 28,2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.