Laserfiche WebLink
10 September 2001 <br /> AGE-NC Project No. 98-0466 <br /> ' Page of <br /> • St. Joseph's Hospital-AGE identified one well on the site.AGE did not locate a boring log <br /> ' for the well but did find a permit issued by the San Joaquin Local Health District in October <br /> 1972 for a 14-inch well on the west side of Cemetery Lane, which AGE believes to be the <br /> well identified during the drive-by survey. The total depth and perforations for the well are <br /> ' not specified on the permit, but the depth of the grout seal was E pecified to be 50 feet. Mr. <br /> Ray McAlister, plant supervisor for St. Joseph's Hospital, was contacted and revealed that <br /> ' two wells were located side-by-side in the area identified by AGE. He did not know of any <br /> construction details,but did state that the produced water had been tested within the last year <br /> and that the sample did not contain petroleum hydrocarbons ors) TBE. <br /> ' Stockton Rural Cemetery-AGE identified two wells on the site, Records for the wells on <br /> this property were not found. Messrs. Jose DeAnda and Russ DeAnda, supervisors for the <br /> site, knew that one well had been installed in the 1920s and both wells were 250 feet deep. <br /> ' They did not know of any additional construction details for the two wells. The wells are <br /> utilized only for irrigation. <br /> tThis is all the information that AGE has been able to develop on the we s identified in the receptor <br /> survey. A sensitive receptor survey will be completed for the north port on of the property and will <br /> ' be presented in the report of findings to be prepared following complition of the scope of work <br /> detailed in this work plan. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br />