Laserfiche WebLink
09/_5/98 'NED .15: 31 FA_' 20943 ' ' L18 :tic-i-•:.�aTp� � '1 003 <br /> �-. <br /> tA September I998 <br /> ACE-NC Project No. 98-0466 <br /> Page 2 of 3 <br /> investigation or a Ju _Hcaion for site closure. <br /> PROPOSED SCOPE OF WORK <br /> The foilcwina sceoe of work is propos:_' to obtain site Iles=.;.:-e for 7.1:-z fe ...er Gasoline UST area <br /> • Drilling and sampling. off one =oil c,- use.torme: UST excavation. The bor na <br /> Should be advanced to dept`:s of approx _aat`i; 5 feet and sail d grou;.d wzte:sampies <br /> collected. i_`analysis of these soil samples,indicates :hat pe'_cle, hydrocarbons a.- scz <br /> present, a CSR.shouid.be pmpa.-eddrecarn mended site closure. <br /> • work pian, d:-lling perriir and permit should be submire to and approved by `he <br /> PHS-E-rM prior to performance of Held wor1C <br /> T'fne io llowir-g scope of work is croon sed to.dote.. i Ie tf addir_onal :nvest aadon/n2ittganon or stte <br /> closure is jurdfled for he fcrser bun:. cis and areas.- <br /> Review <br /> reas:Review of zl cer:nenL inf6rmadon for ie Site on?!e W i he c Z) and CVRWQC3. <br /> 42ter the review, a Site Suzan ar; Re r-L (SSR) should be prIpared. Tae SSR should <br /> slnllntai nze all previous mvesuganon and =,aganon pe^otmed the burn.pit and Lee= c <br /> areas. Laboratory analysis should be present.d in racularforu and fie report should ineiude <br /> recommendadcns.for additional mitigation er jusification for clo <br /> • Tae repos should be submined ro the CVRWQC3 for review. I addirional nitigauon is <br /> necessary, 'uM&L'vt.shotJd request that the PHS- ,HD be assigned oversight,for.the site. <br /> ESTIM4TED COSTS <br /> Estimated costs for completion of the proposed scer of warts are as fall ws: <br /> Former Gasoline UST area. <br /> Task 1: Preparation of Wor'. ?lan,.permit'aid pecan fee S 756 00 <br /> Task 2:Ihilling and Sampling of Sail�Bering S 1,406.00 <br /> Task 3: Laboratory Analys s: S 735.00 <br /> Task 1:.Prermation of Close SUr­"M_aryReport: S 1,565.00 <br /> -TOTAL: S 1,x•50.00 <br /> - .i Waned Gea EavEnamen;sf,::.e <br />