My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:55:20 PM
Creation date
6/17/2020 11:34:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 AOC WORK PLANS <br /> This section presents a detailed workplan for each of the 11 AOCs. The in formation for each site <br /> consists of(1)a site summary presenting the background information for fl ie site,(2)the proposed <br /> activities and the rationale for the activities(if warranted), and(3) a plate s itowing the locations of <br /> the proposed activities(where warranted). <br /> 4.1 Area of Concerns Recommended For No Ft rther <br /> Investigation <br /> As discussed above, several investigative events have been performed at the Site to assess whether <br /> releases have occurred or to evaluate the extent of releases in the aforemer.tioned AOCs. Several <br /> of the investigation events also included soil removal activities and source removal. On the basis <br /> of these investigative events,previous review of regulatory files,and prior discussions with <br /> AMMC and regulatory personnel (which are discussed in further detail below in each AOC <br /> Workplan),it is our opinion that the following AOCs do not require additional investigation: <br /> • Pentachlorophenol Areas <br /> • Underground Storage Tanks <br /> • Septic Tanks <br /> • Polychlorinated Biphenyl Containing Transformers <br /> A discussion of prior investigation actives and the rational for no further i ivestigation follows in <br /> the sections below. <br /> 4.1.1 Pentachlorophenol Areas <br /> Site Summary <br /> Draft <br /> KB61125 workplan-ESC MACTEC Engineering and Consulting, Inc. 12 <br /> September 28,2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.