My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:55:20 PM
Creation date
6/17/2020 11:34:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AOC Work Plans <br /> In 2001,AGE drilled one boring(PB9)adjacent to the former teepee strut ire. One soil and one <br /> grab groundwater sample were submitted for laboratory analyses for TPH s gasoline(TPHg), <br /> TPHd,TPHmo, VOCs,and SVOCs from this boring. Metals concentratio s detected in the soil <br /> sample were at or below background levels and TPHg,TPHd,TPHmo,VOCs and SVOCs were all <br /> below reporting limits in soil and groundwater. All dissolved metals samp les from boring P139 <br /> were below the applicable cleanup levels. <br /> Data Gaps <br /> Additional sampling is necessary along the sidewalls and floors of the forn ter teepee structure to <br /> confirm all soils in excess of residential PRGs have been removed. <br /> Field Investigation Approach <br /> Confirmation soil sampling will be performed in the vicinity of the former teepee structure as <br /> follows. A total of ten soil samples,two samples per test pit will be collec ed. Three test pits will <br /> be excavated within the former teepee structure and two test pits will be excavated outside the <br /> boundaries of the former structure as indicated on Plate 4.3. Soil samples 'll be collected from <br /> each test pit at depths of one and three feet bgs by either driving sample tubes directly into the soils <br /> from the test pit or by driving the tube directly into the backhoe bucket. Soil samples will be <br /> analyzed for VOCs, SVOCs,Dioxins and Furans,PCBs,TPHd,TPHmo,a Lid metals. <br /> Draft <br /> KB61125 workplan-ESC MACTEC Engineering and Consulting, Inc. 31 <br /> September 28,2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.