My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:55:20 PM
Creation date
6/17/2020 11:34:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41 <br /> 07 May 2002 <br /> AGE-NC Project No. 98-0466 <br /> Page 15 of 16 <br /> 8.1. WESTERN DITCH <br /> Two soil borings(PB 13 and PB 14)are proposed to be advanced alongthe down-stream reach of the <br /> western ditch area west of the subject property for collection of soil and ground water samples. <br /> Ground water and select soil samples collected from the western ditch at,ea will be analyzed for: <br /> • Total lead, zinc and chromium by EPA Method 6010 in soil; and <br /> • Dissolved lead, zinc and chromium by EPA Method 200.7 in gro Ind water. <br /> 8.2. MILLWORKS WASH-DOWN AREA <br /> Two borings (PB15 and P1316) will be advanced in the general was down areas north of the <br /> Millwork Building north of soil boring PBS. Soil and ground water sanTles collected from borings <br /> will be analyzed for full-range TPH by EPA Method 8015M. <br /> 8.3. NORTH BURN PIT AND NORTH STORM WATER POND <br /> One soil boring (PB 17) will be advanced north (down-gradient) of thenorth bum pit and the north <br /> storm water pond for collection of ground water samples. Ground water samples will be analyzed <br /> for: <br /> • Dissolved nickel, copper, lead, zinc and chromium by EPA Method 200.7 in ground water; <br /> and <br /> • Full-range TPH by EPA Method 8015M. <br /> 8.4. FORMER TEEPEE STRUCTURE INCINERATOR <br /> Three soil borings will be advanced within the former teepee structure incinerator pit to collect soil <br /> samples. Soil samples collected from the proposed shallow borings within the former teepee <br /> structure incinerator will be analyzed for: <br /> • Total nickel, copper, lead, zinc, arsenic and chromium by EPA Methods 7521, 7421, 289.2, <br /> 7061, 7190, respectively, (Waste Extraction Test; WET) using d -ionized(DI) water; <br /> • TRPH by EPA Method 418.1 using a WET Method with DI wat r; and <br /> • VOCs, including PCE and TCE,by EPA Method 8260 using a WE T Method with DI water. <br /> Advanced GeoEnvtronn ental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.