My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:55:20 PM
Creation date
6/17/2020 11:34:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.1. SITE HISTORY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 3.0. PRIOR SITE ASSESSMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 3.1. WESTERN DITCH AREA . . . . . . . . . . . . . . . . . . 2 <br /> 3.1.1. North Steam Cleaning Area- SCA2 . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 3.1.2. Western Drainage Ditch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 3.2. MILLWORKS BUILDING WASH-DOWN AREA . . . .. . . . . . . . . . . . . . . . . . . 4 <br /> 3.3. NORTH STORM WATER RETENTION BASIN . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.4. BURN PITS AND FORMER TEEPEE STRUCTURE INCINERATOR . . . . . . 5 <br /> 3.4.1. Burn Pits and Former Teepee Area Assessment Status . . . . . . . . . . . . . . 5 <br /> 3.4.2. Soil Stockpiles Assessment Status . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 4.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 4.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES . . . . . . . . . . . . . . . . . 10 <br /> 4.2. SOIL BORINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 <br /> 4.3. HEALTH RISK ASSESSMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 <br /> 5.0. FIELD INVESTIGATION . . . . . . . . . . . . . 11 <br /> 5.1. PREPARATIONS FOR FIELD WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 <br /> 5.2. PROBE BORING ADVANCEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 <br /> 5.3. SOIL SAMPE COLLECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 <br /> 5.3.1. Former Teepee Structure Incinerator Pit . . . . . . . . . . . . . . . . . . . . . . . . 12 <br /> 5.3.2. Soil Stockpiles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 <br /> 5.4. COLLECTION OF GRAB GROUND WATER SAMPLES . . . . . . . . . . . . . . . 13 <br /> 6.0. QUALITY ASSURANCE AND QUALITY CONTROL . . . s . . . . . . . . . . . . . . . . . 13 <br /> 7.0. EQUIPMENT DECONTAMINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 <br /> 8.0. LABORATORY ANALYSES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 <br /> 8.1. WESTERN DITCH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 <br /> 8.2. MILLWORKS BUILDING WASH-DOWN AREA . . . . . . . . . . . . . . . . . . . . . 15 <br /> 8.3. NORTH BURN PIT AND NORTH STORM WATER OND . . . . . . . . . . . . . 15 <br /> 8.4. FORMER TEEPEE STRUCTURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 <br /> 8.5. SOIL STOCKPILES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 <br /> 8.5.1. Bum Pit Soil Stockpiles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 <br /> 8.5.2. Former Teepee Structure Stockpiles . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 <br /> 9.0. REPORT PREPARATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 <br /> LIST OF FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 - Site Map <br /> Figure 3 - Site Plan - South <br /> Figure 4 - Site Plan -North <br /> Figure 5 - Site Plan - Western Ditch/Teepee Structure Area <br /> Figure 6 - Soil Stockpiles Sampling Locations <br /> Figure 7 - Soil Stockpiles Sampling Locations -Lead <br /> LIST OF APPENDICES <br /> Appendix A - Stockton Service Station Equipment Company (1994) Soil Stockpile Location Map <br /> Advanced GeoEnviron ental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.