My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:55:20 PM
Creation date
6/17/2020 11:34:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 • <br /> 1 11 September 2001 <br /> AGE-NC Project No. 98-0466 <br /> 1 Page 22 of 24 <br /> 1 • Formaldehyde by EPA Method 8315; <br /> • Total lead, zinc and chromium by EPA Method 6010 in soil; and <br /> 1 • Dissolved lead, zinc and chromium by EPA Method 200.7 in ground water. <br /> 1 7.5. MILLWORKS BUILDING SEPTIC LEACHFIELD <br /> AGE proposes to advance one boring (PB7) in the leachfield area to recheck the formaldehyde <br /> 1 previously detected and to analyze for dissolve metals. The water samr le will be analyzed for: <br /> 1 • Formaldehyde by EPA Method 8315; and <br /> • Dissolved nickel, copper, lead, zinc and chromium by EPA Me od 200.7. <br /> 1 <br /> 7.6. OTHER WASH-DOWN AREAS <br /> 1 Borings will be advanced in the general wash-down areas north of thel Millwork Building (PB8), <br /> near the Saw Filing Room(PB5), and near the 44 x 120 Storage Building(PB 10). Soil and ground <br /> ' water samples collected from borings will be analyzed for: <br /> • Full-range TPH by EPA Method 8015M; and <br /> 1 • Formaldehyde by EPA Method 8315. <br /> 1 7.7. FORMER TEEPEE STRUCTURE AND PRIMING BUILDING WASH DOWN AREA <br /> 1 <br /> Groundwater samples collected from the proposed boring(PB9)betwee the Primer Building wash- <br /> down area and the former teepee structure will be analyzed for: <br /> 1 • Total nickel, copper, lead, zinc and chromium by EPA Method 6010 in soil; <br /> • Dissolved nickel, copper, lead, zinc and chromium by EPA Met hod 200.7 in ground water; <br /> 1 • Total arsenic by EPA Method 7060 in soil; <br /> • Dissolved arsenic by EPA Method 206.2 in ground water; <br /> 1 • VOCs, including PCE and TCE,by EPA Method 8260; <br /> • SVOCs, including PCP/TCP, by EPA Method 8260; <br /> 1 Advanced GeoEnvironmental,Inc. <br /> 1 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.