My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 3:11:51 PM
Creation date
6/17/2020 1:32:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1989
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Temperature. Temperature will be measured with an NBS <br /> mercury thermometer and reported to the nearest 1/2 degree <br /> centigrade. <br /> Specific Conductivity. The specific conductivity will be <br /> measured with a specific conductivity meter. Readings will <br /> be reported to the number of significant figures appropriate <br /> for the measurement. <br /> o Preventive Maintenance. Preventive maintenance of equipment is <br /> essential if project resources are to be used in a cost effective <br /> manner. Preventive maintenance will take two forms: (1) a <br /> schedule of preventive maintenance activities to minimize downtime <br /> and ensure accuracy of measurement systems and (2) availability of <br /> critical spare parts, backup systems, and equipment. <br /> o Corrective Action. If quality control audits of data result in <br /> detection of unacceptable data, the individual in charge of the <br /> specific investigation will be responsible for developing and <br /> initiating corrective action. Corrective action for field <br /> measurements may include: <br /> - Repeat the measurement to check the error. <br /> - Check for all proper adjustments for ambient conditions <br /> such as temperature. <br /> - Check the batteries (if any) of instrument or measurement <br /> device. <br /> - Check the calibration of instrument or measurement device. <br /> - Replace the instrument or measurement devices. <br /> Corrective action for sampling procedures may include: <br /> - Evaluating and amending sampling procedures. <br /> - Reanalyzing samples if holding time criteria permits. <br /> A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.