My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 2:56:59 PM
Creation date
6/17/2020 1:34:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1990
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 <br /> December 10 . 1990 <br /> M . Jim Au eng �6 <br /> De artmen of Health Servic -s DEC 1 7 WO <br /> To is S stance Control ivision <br /> 101 1 oydon Wa ENVIRONMENTAL HEALTH <br /> Sacr nto . California 95827 PEFcPeIT/SER,V10ES <br /> RE: Progress Report for October and November . 1990 <br /> Dear Mr . Austreng : <br /> The following is a report of the activities at the <br /> Stockton site during October and November , 1990. <br /> A. Groundwater Monitoring. <br /> Quarterly samples were taken the week of October <br /> 15th . This sample was based on the reduced number <br /> of wells that was approved by the Department of <br /> Health Services and California Water Quality <br /> Control Board . The report of the Lysimeter tests <br /> is attached . The Monitor Well Report should be <br /> mailed by December 7th . <br /> The next round is scheduled for mid—January . <br /> B. Remedial Activities . <br /> I . Surface Soils/Pipes and Culverts . <br /> Martech , Inc . has been selected for this <br /> contract . The pre—construction meeting was <br /> held in Sacramento on November 14. 1990. <br /> Jim Austreng was present from the Department <br /> of Health Services . We are in the process <br /> of obtaining access to private property for <br /> soil removal and replacement . Construction <br /> should start in the near future . <br /> MARL£Y <br /> the <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.