My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1992-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 2:56:57 PM
Creation date
6/17/2020 1:38:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan. 3. 1996 3:66PM No. 6352 P. 1/1 <br /> HEALTH <br /> DUDEK & ASSOCUTES, INC. �'!CE <br /> 605 Third Street 56 JAN -3 PN 3: 2 <br /> Encinitas, CA 92024 <br /> (619)942-5147 <br /> Facsimile(619)632-0164 <br /> FACSEyff E_TRANSMITTAL <br /> TO. Harlan Knoll <br /> San Joaquin County Health Department <br /> FACSEM ME- (209)464-0138 <br /> FROM: Gary Vargas <br /> DATE: January 3, 1996 <br /> RE: Well Construction Details, I-1 (MW-3) <br /> NUMBER OF PAGES SENT(Including Transmittal Sheet): 1 <br /> REMARKS: Construction Details for I-1 (NM-3) <br /> Date drilled: September 1971 <br /> Total depth: 120 feet(aproximate) <br /> Boring diameter, unknown <br /> Cement Seal: land surface to 50 feet(approximate) <br /> Casing type: Steel <br /> Casing diameter: 6 5/%inches <br /> Perforated interval: 80 to 170 feet,bis <br /> Driller: Clark Well <br /> Well MW-3 was constructed in 1971 by Clark Well and used for testing the <br /> cooling towers until 1985 when it was converted to a monitor well. In the early <br /> 1990s, well MW-3 was tied into the treatment system pipeline and renamed <br /> reclamation well 1-1. Approximately, a year ago, well I-1 began producing silt <br /> and sand, indicating that the well screen had collapsed. Well I-1 was taken off <br /> line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.