Laserfiche WebLink
LA <br /> Additional 1,2-DCA investigation JS/ell Survey <br /> Former American Forest Products Facility 'Fable of Contents <br /> URS Project No. 17322736 6/13/2005 <br /> `< Page 2-1 <br /> i <br /> - 2.0 SCOPE OF WORK <br /> 1 <br /> ` The proposed scope of work for the additional 1,2-DCA investigation will include the following tasks: <br /> • Coordination with regulatory agencies to finalize this work plan, and preparation of an <br /> updated health and safety plan; <br /> • One probe to 70 feet bgs using a Power Probe Direct Push drilling rig with continuous core to <br /> identify a coarse-grained unit in the interval of approximately 60 to 70 feet bgs as a <br /> groundwater sampling target; <br /> • Up to six probes to approximately 65 feet with a water sample; <br /> • On-site mobile lab analysis of water samples using United States Environmental Protection <br /> Agency (EPA)Method 8260B; <br /> • Preparation of a well survey for an area within 2,000 feet of the site; <br /> • Continuation of quarterly groundwater monitoring activities; <br /> • Preparation of a closure report containing the results of the field investigation and well <br /> survey. <br /> Details of these tasks and the methods to be used are presented in the following sections. <br /> w <br /> LI <br /> �Is <br /> k <br /> K:\Wprocess\22736WrneTican ForesAWork Plan 20051Work Plan_2065_revOl.doc <br /> 1 <br /> 1 <br />