Laserfiche WebLink
U E058 <br /> UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page a of 1) <br /> Type of Action ❑Installation Inspection ❑Repair Inspection ❑x 36 Month Inspection <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10181547 2/11/2019 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Pacific Bell Telephone Co.dba AT&T California <br /> Business Site Address City ZIP Code <br /> 10 E. 12th St. Tracy 95376 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection(Print as shown on the ICC Certification.) Phone# <br /> Gage hart 1(714)560-8222 <br /> Contractor/Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 588098 18361014 06/12/2019 <br /> Overfill Prevention Equipment Inspection Training and Certifications(List applicable certifications.) <br /> veeder-Root TLS Technician <br /> III. OVERFILL PREVENTION EQUIPMENT INSPECTION <br /> Inspection Method ❑Manufacturer Guidelines(Specify): <br /> Used: „ n � . � <br /> Industry Code or Engineering Standard(Specify): PEI RP 1200 <br /> ❑Engineered Method(Specify): ENVIRONMENTAL HEALTH <br /> Attach the inspection procedures and all documentation required to determine the results. " e <br /> TANK ID: (By tank number,stored product,etc.) UE0580002 <br /> What is the tank inside diameter?(Inches) 95.750 <br /> Is the fill piping secondarily contained? ❑x Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Is the vent piping secondarily contained? 0 Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Overfill Prevention Equipment Manufacturer(s) Veeder-root <br /> What is the overfill prevention equipment response ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow <br /> when activated? <br /> (Check all that apply.) ❑Restricts Flow ❑Restricts Flow ❑Restricts Flow ❑Restricts Flow <br /> ❑X AN Alarm ❑AN Alarm ❑AN Alarm ❑AN Alarm <br /> Are flow restrictors installed on vent piping? ❑Yes [j]No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> At what level in the tank is the overfill prevention set <br /> to activate?(Inches from bottom of tank.) 80.750 <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 90% <br /> Is the overfill prevention in proper operating condition 0 Yes ❑Yes ❑Yes ❑Yes <br /> to respond when the substance reaches the <br /> appropriate level? ❑No(Specify in V.) ❑No(Specify in V.) ❑No(Specify in V.) ❑No(Specify in V) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ❑x Pass ❑Fail I ❑Pass ❑Fail I ❑Pass ❑Fail ❑Pass ❑Fail <br /> V. COMMENTS <br /> Any items marked"Fail'must be explained in this section. Any additional comments may also be provided here. <br /> ❑Check if Action Item(s)Are Present <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipment was inspected in accordance with California Code of Regulations,Title 23, <br /> Division 3,Chapter 16,Section 2637.2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> Gaye'runt <br /> If the facility has more components than this form accommodates,additional copies of this page may be attached. <br /> CERS=California Environmental Reporting System,ID=Identification,UST=Underground Storage Tank,ICC=International Code Council,AIV=Audible and Visual <br />