Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 10. TESTING AND MAINTENANCE Yes No NA Date last <br /> performed <br /> Has monitoring system certification been completed within the past © © 11/19/20 <br /> 12 months? <br /> Has spill container testing been completed within the past C ® 11/19/20 <br /> 12 months? <br /> Has overfill prevention equipment inspection been completed within © © 11/08/18 <br /> the past 36 months? <br /> Has secondary containment testing been completed within the past ® 11/08/18 <br /> 36 months? <br /> Has tank tightness testing been completed within required © [-1 f✓ <br /> timeframes? <br /> Has line tightness testing been completed within the required © 0 f✓ <br /> timeframes? <br /> Other Test / Maintenance: <br /> Other Test / Maintenance: <br /> Other Test / Maintenance: <br /> 11. FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties received the required facility ©âœ“ In <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> All answers marked "No" must be described by the designated UST operator in Section 3, <br /> Page 4 of 4 <br />