My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 9:27:37 AM
Creation date
6/18/2020 9:46:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />RESPONSE PLAN - PAGE 1 (One form per facility) <br />ROI TYPE OF ACTION II 1. NEW PLAN Li 2. CHANGE OF INFORMATION <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) _ _ <br />BUSINESS NAME (Same as FACILITY NAME) R02. <br />Supervalu, Inc <br />BUSINESS SITE ADDRESS R03 <br />1990 Piccoli Rd <br />CITY R04. <br />Stockton <br />H. SPILL CONTROL AND CLEANUP METHODS <br />This plan addresses unauthorized releases from UST systems and supplements the emergency response plans <br />Business Plan. <br />D If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g., activate <br />remaining hazardous material from the UST system. <br />D Any release to secondary containment will be pumped or otherwise removed within a time consistent with <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. <br />for their intended use, will be managed as hazardous waste. <br />D Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent <br />effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination <br />it is non-hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and <br />appropriately. <br />D Facility personnel will determine whether any water removed from secondary containment systems, or from <br />hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a waste determination <br />that it is non-hazardous. lithe water has a petroleum sheen (i.e., rainbow colors), it is contaminated. A thick <br />rainbow colors. Water (hazardous or non-hazardous) from sumps, spill containers, etc. will not be disposed to <br />D We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br />Hazardous material in contact with secondary containment is not compatible with the material used for secondary <br />Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material <br />Hazardous material, other than the product/waste stored in the primary containment system, is placed <br />released product/waste, and the added material or resulting material from such a combination is not compatible <br />and procedures in the facilitys Hazardous Materials <br />pump shut-off, etc.) and, if necessary, safely remove <br />the ability of the secondary containment system to <br />Recovered hazardous materials, unless still suitable <br />material which has become too saturated to be <br />in accordance with 22 CCR §66262.11 fmds that <br />sealed container. Waste material shall be disposed <br />clean-up activity, has been in contact with any <br />in accordance with 22 CCR §66262.11 finds <br />floating petroleum layer may not necessarily display <br />storm water systems. <br />containment; <br />collected in secondary containment, <br />inside secondary containment to treat or neutralize <br />with secondary containment. <br />HI. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br />equipment is inspected at least monthly, and after each use, supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED: (Complete only if applicable) <br />EQUIPMENT LOCATION AVAILABILITY <br />RIO. <br />Absorbent Materials <br />R.20. <br />Fuel Island/Maintenance Shop <br /> <br />On Site <br />R1I. <br />Absorbent Materials <br />R2I. <br />Mobile Fueler Truck Spill Kt <br /> <br />On Site <br />RI2. <br />Brooms/Shovels <br />R22. <br />Fuel Island/Maintenance Shop <br />R.32. <br />On Ste <br />RI3. <br />Pigs <br />R23. <br />Fuel Island/Maintenance Shop <br />R.33. <br />On Site <br />R14. R24. R34. <br />RI5. R25. R.35. <br />IV. RESPONSIBLE PERSONS <br />THE FOLLOWING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br />NAME R40. <br />Erik Brown <br />TITLE R50 <br />Transportation Manager <br />NAME R.41. <br />Keith Sample <br />TITLE R5I <br />Transportation Supervisor <br />NAME R42. <br />Andrew Butterfield <br />TITLE R52 <br />Risk Safety Manager <br />NAME R43. <br />Carlos Arellano <br />TITLE R53. <br />Maintenance Manager <br />V. MONITORING INDICATORS <br />IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE, STEPS <br />by qualified persons <br />TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br />Additional system testing or data collection 17 Inspection M Recalibnftion of equipment <br />Other: <br />R60. <br />UST Response Plan (12/2010) - 1/3.
The URL can be used to link to this page
Your browser does not support the video tag.