My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 9:27:37 AM
Creation date
6/18/2020 9:46:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />UNDERGROUND STORAGE TANK <br />SECONDARY CONTAINMENT TESTING REPORT FORM (Page 4 01 6) <br />XIII. VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION <br />Manufacturer Identify Tank ID from Section III for each Manufacturer <br />A D <br />A D <br />BE: C D <br />B L CL] D L] <br />Test Method Used: ['Manufacturer Guidelines (Specify): <br />ID Industry Code or Engineering Standard (Specify): <br />Li Engineered Method (Specify): <br />Attach the testing procedures and all documentation required to determine the results. <br /># of Attached Pages <br />Vapor Recovery Piping Containment Testing Training and Certifications (List applicable certifications.) Expiration Date <br />Interstitial Communication Verification Method Used: <br />XIV. COMMENTS <br />Provide any additional comments here. <br />Retest after repair on diesel high flow only pressure test. <br />XV. TURBINE / PRODUCT PIPING SUMP TESTING INFORMATION <br />Manufacturer Identify Tank ID from Section III for each Manufacturer <br />07-03-2021 A X B J C 'D D <br />AE B El c1J D n <br />Test Method Used: <br />Nili (iv' I <br />El Manufacturer Guidelines (Specify): 4" Dial Gauge <br />0 Industry Code or Fngineering Standard (Specify): <br />['Engineered Method (Specify): <br />Attach the testing procedures and all documentation required to determine the results. <br /># of Attached Pages <br />Expiration Date Turbine / Product Piping Sump Testing Training and Certifications (List applicable certifications.) <br />8374133 07-03-2021 <br />Icon 04-05-2021 <br />XVI. COMMENTS <br />Provide any additional comments here. <br />Installed two new Icon boots on High flow diesel line. <br />ID= Identification
The URL can be used to link to this page
Your browser does not support the video tag.