Laserfiche WebLink
I <br />UNDERGROUND STORAGE TANK <br />SECONDARY CONTAINMENT TESTING REPORT FORM (Page 4 01 6) <br />XIII. VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION <br />Manufacturer Identify Tank ID from Section III for each Manufacturer <br />A D <br />A D <br />BE: C D <br />B L CL] D L] <br />Test Method Used: ['Manufacturer Guidelines (Specify): <br />ID Industry Code or Engineering Standard (Specify): <br />Li Engineered Method (Specify): <br />Attach the testing procedures and all documentation required to determine the results. <br /># of Attached Pages <br />Vapor Recovery Piping Containment Testing Training and Certifications (List applicable certifications.) Expiration Date <br />Interstitial Communication Verification Method Used: <br />XIV. COMMENTS <br />Provide any additional comments here. <br />Retest after repair on diesel high flow only pressure test. <br />XV. TURBINE / PRODUCT PIPING SUMP TESTING INFORMATION <br />Manufacturer Identify Tank ID from Section III for each Manufacturer <br />07-03-2021 A X B J C 'D D <br />AE B El c1J D n <br />Test Method Used: <br />Nili (iv' I <br />El Manufacturer Guidelines (Specify): 4" Dial Gauge <br />0 Industry Code or Fngineering Standard (Specify): <br />['Engineered Method (Specify): <br />Attach the testing procedures and all documentation required to determine the results. <br /># of Attached Pages <br />Expiration Date Turbine / Product Piping Sump Testing Training and Certifications (List applicable certifications.) <br />8374133 07-03-2021 <br />Icon 04-05-2021 <br />XVI. COMMENTS <br />Provide any additional comments here. <br />Installed two new Icon boots on High flow diesel line. <br />ID= Identification