My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 9:27:37 AM
Creation date
6/18/2020 9:46:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOJNDERGROUND STO-fi ft, <br />DESIGNATED UNDERGROUND ST'ORAGE TANK OPERATOR VISUAL INSPECTION REPORT (Page 2 of 2) I <br />VII. INSPECTION HISTORY Y N <br />Has each follow-up action of section III from the previous inspection been completed appropriately? <br />(Attach documentation verifying appropriate service to this report.) El 0 <br />VIII. ALARM HISTORY <br />Attach a copy of the alarm history report/log to this report. Y N NA <br />Is the monitoring system powered on and in proper operating mode? a 0 0 <br />Has each leak detection alarm since the previous inspection been responded to appropriately? <br />(Attach documentation verifying appropriate service to this report.) El El El <br />Have all containment sumps, that have had a leak detection alarm since the previous inspection, been responded to by a qualified UST <br />service technician? <br />• • rz <br />List below in section IX, all containment sumps that have had a leak detection alarm since the previous inspection and have not been <br />responded to by a qualified UST service technician. Containment sumps listed below require a visual inspection for damage, water, debris, <br />hazardous substance, and proper sensor location. The results of the visual inspection must be recorded in section IX. <br />IX. UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br />Is the containment sump free of damage, water, debris, and hazardous substance? <br />Containment Sump ID Y N Containment Sump ID Y N <br />Sump 1 ElLI 0 0 <br />Sump 2 rLJ LID <br />s 0 • 0 <br />0 LID <br />Are all sensors in containment sumps inspected located to detect a leak at the earliest opportunity? N 0 <br />Is the spill container free of damage, water, debris, and hazardous substance? <br />TANK ID Tank 1 0 LIE] <br />ID El <br />I <br />0 0 <br />Is the fill pipe free of obstructions? <br />TANK ID Tank 1 • 0 <br />LI O I 0E 0 <br />Is the fill cap securely on the fill pipe? <br />TANK ID Tank 1 Q D ULi <br />• El LI D <br />Is the under-dispenser containment free of damage, water, debris, and hazardous substance? <br />Under-dispenser Containment ID Y N NA Under-dispenser Containment ID Y N NA <br />Dispenser 1 r • • LI 0 0 <br />0 • 1-1 0 0 0 <br />• U. • • • <br />0 0 0 DD E] <br />UDU • [I <br />0 0 • 0 0 0 <br />Are all sensors in under-dispenser containment located to detect a leak at the earliest opportunity? LI MI <br />TESTING AND MAINTENANCE Y N NA DATE LAST <br />PERFORMED <br />Has the monitoring system certification been completed within the past 12 months? III <br />:',0--'. 76aat <br />11/20/19 <br />11/20/19 Has the spill container testing been completed within the past 12 months? - • <br />Has the overfill prevention equipment inspection been completed within the past 36 months? • • • 11/08/18 <br />Has the secondary containment testing been completed within the past 36 months? - 1:1 0 11/08/18 <br />Has the tank tightness testing been completed within required timeframes? 0 • <br />Has the line tightness testing been completed within the required timeframes? • El <br />Other required testing! maintenance was completed within required timeframe. (List tesUmaintenance items below.) <br />jest / Maintenanclkaar boot replaced .4 0 12/23/19 <br />Test / Maintenance: U 0 <br />Test! Maintenance: El El <br />Test / Maintenance: • 0 <br />Test / Maintenance: • 0 <br />Test / Maintenance: El 0 <br />FACILITY EMPLOYEE TRAINING Y N <br />Have all individuals performing facility employee duties received the required facility employee training within the past 12 months? 0 0 <br />If the facility has more components than this form accommodates, additional copies of this page may be attached. <br />V = Vpc N = Nn Nt = Annlirahlp in = lehantifiratinn
The URL can be used to link to this page
Your browser does not support the video tag.